INSP-Final Inspection | 3/23/2006 | 3/23/2006 | 3/23/2006 | P | PASS |
Forrest France
|
|
|
Fire alarm passed final inspection.
|
INSP-Alarm Testing | 3/20/2006 | 3/21/2006 | 3/21/2006 | A | PASS |
Forrest France
|
|
|
Fire alarm passed inspection.
|
INSP-Alarm Testing | 3/16/2006 | 3/17/2006 | 3/17/2006 | A | PART |
Forrest France
|
|
|
Per state elevator requirements, the top of shaft will require a heat detector, need to test elevator lobby SD 3rd floor north and smoke and heat in top of shaft, outside bell repaired while on site, panel, sprinkler, notification, alarm, supervision, trouble and EOL tested okay, provide signal verification as discussed, provide as-builts and updated map at next inspection, provide signage at the door to the FACP.
|
INSP-Alarm Testing | 3/16/2006 | 3/16/2006 | 3/16/2006 | A | NR |
Forrest France
|
|
|
State elevator inspection failed, alarm inspection to be rescheduled.
|
CHANGE STATUS TO (ISS) | | | 2/16/2006 | | DONE |
|
|
|
for new structure
|
Plan assigned to (Mary) | 9/2/2005 | | 2/14/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 2/14/2006 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/14/2006 | | 2/14/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/14/2006 | | |
|
|
|
|
Telephone call | | | 2/14/2006 | | DONE |
|
|
|
tlk to matt casey ###-#### that permit is ready to be picked up no fee
|
Plan resubmittals received | | | 1/26/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/14/2005 | | FAIL |
|
|
|
No comments written. Incorrect monitoring on the Isis elevator.
|
Application received | | | 9/2/2005 | | |
|
|
|
|