INSP-Final Inspection | 11/7/2005 | 11/9/2005 | 11/9/2005 | A | PASS |
Forrest France
|
|
|
Fire alarm passed inspection.
|
INSP-Conference | 10/18/2005 | 10/19/2005 | 10/19/2005 | A | FAIL |
Forrest France
|
|
|
Provide the correct cd rating for the open office space strobe as required by the room dimentions, need to test EOL voltage drop, and verify signals.
|
Plan assigned to (Mary) | 9/7/2005 | | 9/16/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/16/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/16/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/16/2005 | | 9/16/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/16/2005 | | DONE |
|
|
|
Spoke with Charmaine to leave a message for John told him that permit is ready & fees///9/16/05 11:00am BAS
|
Issue permit | | | 9/16/2005 | | DONE |
|
|
|
|
Case Summary | | | 9/7/2005 | | DONE |
|
|
|
|
Application received | | | 9/7/2005 | | |
|
|
|
|