INSP-Final Inspection | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 11/22/2006 | 11/22/2006 | 11/22/2006 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler heads in temporary corridor are ok to cover
|
INSP-Sprinkler Rough-in | 11/15/2006 | 11/15/2006 | 11/15/2006 | P | PASS |
Troy Cobbley
|
|
|
Pendant heads in the pharmacy area, as installed in the ceiling tile have passed. Waiting on alarms and life safety.
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2006 | 11/8/2006 | 11/8/2006 | P | PART |
Forrest France
|
|
|
AG hydrostatic test of the 1st floor east wing system is satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 10/18/2006 | 10/19/2006 | 10/19/2006 | A | PASS |
Troy Cobbley
|
|
|
Hydro test for the south tower dry standpipe passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/17/2006 | 10/17/2006 | 10/17/2006 | P | FAIL |
Troy Cobbley
|
|
|
Hydro test of the relocated south standpipe failed.
|
INSP-Sprinkler Rough-in | 10/2/2006 | 10/3/2006 | 10/3/2006 | A | PASS |
Troy Cobbley
|
|
|
See city approved plans for locations of the sprinkler piping that is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping located above the hard lid ceilings is ok to cover. Exact locations are marked on the approved plans.
|
INSP-Sprinkler Rough-in | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PART |
Troy Cobbley
|
|
|
See city approved plans for exact locations approved for rough-in and locations of corrections. Hangers on end lines need to have hangers prevent the upward movement of the sprinkler piping due to pressures in excess of 100psi. Also plans need to be resubmitted with corrections per the review comments.
|
FIR-Aging Inspection | 12/14/2005 | 12/14/2005 | 12/15/2005 | | NR |
Troy Cobbley
|
|
|
Work in progress
|
Permit Ready to Issue | | | 9/9/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/9/2005 | | 9/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/9/2005 | | DONE |
|
|
|
Spoke with Greg and told him that permit is ready & fees///9/9/05 11:05am BAS
|
Issue permit | | | 9/9/2005 | | |
|
|
|
|
Application received | | | 9/8/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 9/8/2005 | | 9/8/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/8/2005 | | 9/8/2005 | | PASS |
Bill Alexander
|
|
|
This review is in conjuction with FIR05-00536 (ST ALPHONSUS CENTRAL TOWER - INTERIOR FIT UP FOR BASEMENT & 1ST FLOOR W/U.G. PUMP, TANK, ETC.)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2005 | | DONE |
|
|
|
|