Permit Information
Permit NumberFIR05-00582
StatusFinaled
Name ST ALPHONSUS REG MEDICAL CNTR
Site Address 1055 N CURTIS RD
Project NameSPR SARMC 1ST FLR PHARMACY
Customer Number 
ePlanReview 
Description
(ST ALPHONSUS CENTRAL TOWER)(1ST FLOOR PHARMACY) To finish fire sprinklers protection for approximately 14,260-ft/2 of the first floor and the required exit system that serves this area, for use as a Pharmacy Unit, with associated support services. Fire sprinkler work is related to modify the shell system installing under FIR05-00536 for the construction of interior non-bearing, non-combustible, fire-resistive walls and suspended ceiling grid system. All fire sprinkler work will be per the IFC 2003, plans, plans notes and attached plan review comments/conditions, as regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-00635.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/6/200612/7/200612/7/2006APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in11/22/200611/22/200611/22/2006PPASS
DetailsTroy Cobbley
Sprinkler heads in temporary corridor are ok to cover
INSP-Sprinkler Rough-in11/15/200611/15/200611/15/2006PPASS
DetailsTroy Cobbley
Pendant heads in the pharmacy area, as installed in the ceiling tile have passed. Waiting on alarms and life safety.
INSP-Sprinkler Rough-in/Hydro11/8/200611/8/200611/8/2006PPART
DetailsForrest France
AG hydrostatic test of the 1st floor east wing system is satisfactory.
INSP-Sprinkler Rough-in/Hydro10/18/200610/19/200610/19/2006APASS
DetailsTroy Cobbley
Hydro test for the south tower dry standpipe passed.
INSP-Sprinkler Rough-in/Hydro10/17/200610/17/200610/17/2006PFAIL
DetailsTroy Cobbley
Hydro test of the relocated south standpipe failed.
INSP-Sprinkler Rough-in10/2/200610/3/200610/3/2006APASS
DetailsTroy Cobbley
See city approved plans for locations of the sprinkler piping that is ok to cover
INSP-Sprinkler Rough-in/Hydro4/25/20064/25/20064/25/2006PPASS
DetailsTroy Cobbley
The sprinkler piping located above the hard lid ceilings is ok to cover. Exact locations are marked on the approved plans.
INSP-Sprinkler Rough-in3/28/20063/28/20063/28/2006PPART
DetailsTroy Cobbley
See city approved plans for exact locations approved for rough-in and locations of corrections. Hangers on end lines need to have hangers prevent the upward movement of the sprinkler piping due to pressures in excess of 100psi. Also plans need to be resubmitted with corrections per the review comments.
FIR-Aging Inspection12/14/200512/14/200512/15/2005 NR
DetailsTroy Cobbley
Work in progress
Permit Ready to Issue  9/9/2005 DONE
Inspection Record Card- Fire9/9/2005 9/9/2005 DONE
Telephone call  9/9/2005 DONE
Spoke with Greg and told him that permit is ready & fees///9/9/05 11:05am BAS
Issue permit  9/9/2005  
Application received  9/8/2005  
Plan assigned to (Bill)9/8/2005 9/8/2005 DONE
Sprinkler Plan Check9/8/2005 9/8/2005 PASS
DetailsBill Alexander
This review is in conjuction with FIR05-00536 (ST ALPHONSUS CENTRAL TOWER - INTERIOR FIT UP FOR BASEMENT & 1ST FLOOR W/U.G. PUMP, TANK, ETC.)
PLANS/APPL TAKEN TO FRONT DESK  9/8/2005 DONE