Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00588
StatusFinaled
Name PEAK ALARM
Site Address 9357 W EMERALD ST
Project Namealm - Cancer Center Idaho
Customer Number 
ePlanReview 
Description
To replace a FACP that was being utilized for pre-action release and sprinkler monitoring. A new DMP panel will monitor the building sprinkler monitoring system and the Potter panel that will be used for single-interlock pre-action release. There are three smoke detectors for door release.

1/4/2006 - Received revised matrix to indicate a single-interlock pre-action system.

There is no associated building permit.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/2/20071/3/20071/3/2007PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection7/7/20067/10/20067/10/2006AFAIL
DetailsTroy Cobbley
Provide map at the facp, fix the pone line one and phone line two reporting, outside alarm bell can not be silenced by the facp and provide atleast 8.3 ah battery for the facp.
FIR-Aging Inspection4/13/20064/13/20064/18/2006 NR
DetailsTroy Cobbley
Per Bill with Peak Alarm the work has not been completed yet.
Issue and Print Permit  1/12/2006 DONE
Alarm Plan Check  1/4/2006 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  1/4/2006 DONE
Permit Ready to Issue  1/4/2006 DONE
Inspection Record Card- Fire1/4/2006 1/4/2006 DONE
Telephone call  1/4/2006 DONE
Left message that permit is ready & fees///1/4/06 @1:40pm BAS
Alarm Plan Check  10/10/2005 FAIL
Phone call to Greg at Farren. Need the additional information.

1) solenoid valve current added to calculation.
2) solenoid valve part number for compatibility
3) pressure switch on potter.
Plan resubmittals received  9/30/2005 DONE
Case Summary  9/30/2005 DONE
Alarm Plan Check  9/22/2005 FAIL
Resubmittal required. Per comments discussed in a meeting.
Meeting  9/22/2005 DONE
Meeting to discuss the pre-action panel configuration.
Case Summary  9/8/2005 DONE
Application received  9/8/2005  
Plan assigned to (Mary)9/8/2005