St Al's Family Maternity Ctr - To install approximately 110' of C-900 CPVC underground with one 45 ell and one 90 ell and a yard PIV; and one MJ 90 ell and C-50 DI stub up through floor with 2" of insulation at collar. The inside riser cannot be located within the 2-hour rated stair enclosure. Per the architect for the TIN permit BLD05-01063, they will be submitting plans within the next couple of days, showing the riser to be separated from the stairwell with a 1-hour rated enclosure having an exterior door. This approval for the underground stub up location is contingent upon receipt and approval of those plans. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002, AWWA, the IFC-2003. No written review comments; final approval subject to plan annotations and satisfactory inspection by PDS/Fire.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/16/20089/16/20089/16/2008APASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush3/31/20063/31/20063/31/2006PPASS
DetailsTroy Cobbley
underground flush passed
INSP-Sprinkler Rough-in/Hydro3/30/20063/30/20063/31/2006PPASS
DetailsTroy Cobbley
Underground hydro test passed.
Plan resubmittals received  3/17/2006  
UG Pipe size modification.
INSP-Sprinkler Rough-in1/25/20061/26/20061/26/2006APASS
DetailsTroy Cobbley
Three lengths of 6" underground supply piping have been installed along the face of the building. They are ok for cover.
INSP-Supply line flush10/19/200510/19/200510/19/2005PPASS
DetailsTroy Cobbley
Inspection was for stub out cover not flush. Underground stub out passed but has changed from coming out the north side to coming out the northwest side
Sprinkler Plan Check9/19/2005 9/19/2005 FAIL
Plan on hold to discuss location of sprinkler riser in stairwell enclosure with Bill Alexander and Building plan reviewer. Called TVFP and advised J. Anderson.
Sprinkler Plan Check9/19/2005 9/19/2005 PASS
The inside riser cannot be located within the 2-hour rated stair enclosure. Per the architect for the TIN permit BLD05-01063, they will be submitting plans within the next couple of days, showing the riser to be separated from the stairwell with a 1-hour rated enclosure having an exterior door. This approval for the underground stub up location is contingent upon receipt and approval of those plans. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002, AWWA, the IFC-2003. No written review comments; final approval subject to plan annotations and satisfactory inspection by PDS/Fire.
PLANS/APPL TAKEN TO FRONT DESK  9/19/2005 DONE
Permit Ready to Issue  9/19/2005 DONE
Inspection Record Card- Fire9/19/2005 9/19/2005 DONE
Telephone call  9/19/2005 DONE
Spoke with Jeff and told him that permit is ready & fees///9/19/05 2:20pm BAS
Issue permit  9/19/2005  
Application received  9/12/2005  
Plan assigned to (Bill)9/12/2005    
Sprinkler Plan Check3/14/2006    
DetailsBill Alexander