INSP-Final Inspection | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | PASS |
Troy Cobbley
|
|
|
fire alarm final
|
INSP-Final Inspection | 11/10/2005 | 11/14/2005 | 11/14/2005 | A | CANC |
Troy Cobbley
|
|
|
Please contact Bill Bloat @ office ###-#### with time. Thank you; Phone #: ###-#### Internet Inspection Request from: Alan Mannor
|
INSP-Final Inspection | 11/4/2005 | 11/8/2005 | 11/8/2005 | A | FAIL |
Troy Cobbley
|
|
|
No access to the facp to shut down power to the duct smoke detector. No test performed.
|
INSP-Final Inspection | 10/20/2005 | 10/28/2005 | 10/28/2005 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm is not ready
|
INSP-Conference | 10/21/2005 | 10/21/2005 | 10/23/2005 | P | NR |
Troy Cobbley
|
|
|
Ralph; ###-#### Work is to be completed next week and inspection called in.
|
Issue and Print Permit | | | 9/27/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/26/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/26/2005 | | 9/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2005 | | DONE |
|
|
|
Left message for Alan that permit is ready & fees///9/26/05 820am BAS
|
Telephone call | | | 9/23/2005 | | DONE |
|
|
|
Talked with Bill, he will bring revised/legible calculations down today.
|
Plan resubmittals received | | | 9/23/2005 | | DONE |
|
|
|
Received legible and revised calculations.,
|
Alarm Plan Check | | | 9/23/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
Plan assigned to (Mary) | 9/13/2005 | | 9/23/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2005 | | DONE |
|
|
|
Called and left a message for Alan that the calcs are illegible.
|
Telephone call | | | 9/19/2005 | | DONE |
|
|
|
Called ALarmco, talked to Cindy and requested the resubmittal of the calculations as they were illegible.
|
Case Summary | | | 9/13/2005 | | DONE |
|
|
|
|
Application received | | | 9/13/2005 | | |
|
|
|
|