INSP-Final Inspection | 5/12/2006 | 5/12/2006 | 5/12/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/27/2006 | 4/27/2006 | 4/27/2006 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | FAIL |
Troy Cobbley
|
|
|
Above ground hydro test failed. I counted six leaks on the floor. I requested that the sprinkler system gets tested before I inspect to save time.
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2006 | 1/12/2006 | 1/12/2006 | A | PART |
Troy Cobbley
|
|
|
Roughin for the building piping passed. Non of the riser has been inspected due to numerous items needing addressed
|
INSP-Sprinkler Rough-in | 1/9/2006 | 1/10/2006 | 1/10/2006 | P | FAIL |
Troy Cobbley
|
|
|
Provide through bolts for the earth quake bracing on the main level. Finish installing upright sprinkler heads in the overbuilds. The main overbuild needs one more upright head for correct coverage. The overbuilds need reinspection. Riser not inspected.
|
FIR-Aging Inspection | 1/4/2006 | 1/4/2006 | 1/6/2006 | | NR |
Troy Cobbley
|
|
|
Job status to be found out.
|
Sprinkler Plan Check | 10/10/2005 | | 11/2/2005 | | PASS |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 11/2/2005 | | DONE |
|
|
|
Took approved plans to permit desk for distributing. Second review, not fees.
|
Telephone call | | | 11/2/2005 | | DONE |
|
|
|
called ###-#### and told Gerald permit ready for pick-up and no fees
|
Plan resubmittals received | | | 10/10/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/5/2005 | | 10/5/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 10/5/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/15/2005 | | 10/4/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/15/2005 | | 10/4/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2005 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/28/2005 | | DONE |
|
|
|
early start written request approved, to allow work prior to issuance of permit; faxed signed copy back to TVFP.
|
Application received | | | 9/15/2005 | | |
|
|
|
|