INSP-Final Inspection | 1/27/2006 | 1/27/2006 | 1/27/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
Issue and Print Permit | | | 1/27/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 1/27/2006 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 1/27/2006 | | DONE |
|
|
|
lft ms with secretry (alan mannor was off) that permit and no fee ready to be picked up
|
Plan resubmittals received | | | 1/13/2006 | | |
|
|
|
|
Case Summary | | | 1/13/2006 | | DONE |
|
|
|
|
INSP-Final Inspection | 1/10/2006 | 1/10/2006 | 1/10/2006 | P | FAIL |
Troy Cobbley
|
|
|
Monitoring not set up. No tampers on the two control valves. Per notes plans need to be resubmitted for the additional valve.
|
Issue permit | | | 1/10/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/28/2005 | | 9/28/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/28/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/28/2005 | | 9/28/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (Mary) | 9/15/2005 | | 9/26/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/26/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/23/2005 | | DONE |
|
|
|
Talked to Bill at Alarmco, I stated I needed the manufacturer's cut sheet that defines the maximum battery charging capacity and the maximum size battery that will fit in the panel.
|
Plan resubmittals received | | | 9/23/2005 | | DONE |
|
|
|
Received manufacturer's cut sheets
|
Case Summary | | | 9/15/2005 | | DONE |
|
|
|
|
Application received | | | 9/15/2005 | | |
|
|
|
|