INSP-Final Inspection | 12/19/2006 | 12/20/2006 | 12/20/2006 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 11/21/2006 | 11/21/2006 | 11/22/2006 | P | CANC |
Forrest France
|
|
|
Wrong permit number requested for inspection.
|
FIR-Aging Inspection | 8/11/2006 | 8/11/2006 | 8/15/2006 | | DEFR |
Forrest France
|
|
|
|
Sprinkler Plan Check | 8/11/2006 | | 8/11/2006 | | PASS |
|
|
|
Approved plan mod's on revised sheet FP2.1.1.
|
Plan resubmittals received | | | 1/13/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 1/13/2006 | | 1/13/2006 | | DONE |
|
|
|
Plan requested to be looked at again? Still indicating that they will split this project-None addressed to date. IFC Fire/Life Safety Inspector will have to verifiy work in progress.
|
Plan assigned to (Bill) | 9/19/2005 | | 10/10/2005 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/10/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/7/2005 | | 10/10/2005 | | PASS |
Bill Alexander
|
|
|
Modified and limited to attached review comments.
|
Plan resubmittals received | | | 10/7/2005 | | |
|
|
|
|
Sprinkler Plan Check | 9/23/2005 | | 9/23/2005 | | FAIL |
|
|
|
plans brought back to office to expedite review; plans not of sufficient detail to distinguish new from exiting; replacement vs relocation; and piping modifications to determine if hydralic perfance was affected. Advised P. Marcolina by phone. Will look at revised plans on site if available at next visit at next visit.
|
Application received | | | 9/19/2005 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|