INSP-Final Inspection | 3/2/2007 | 3/2/2007 | 3/2/2007 | P | PASS |
Forrest France
|
|
|
UG supply line permit finaled, resubmitted and approved under FIR05-00659.
|
INSP-Final Inspection | 7/14/2006 | 7/14/2006 | 7/14/2006 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 7/14/2006 at 7:48:57 AM. Contact: ###-####.
|
Sprinkler Plan Check | 3/14/2006 | | 3/27/2006 | | PASS |
Bill Alexander
|
|
|
This underground modification was resubmitted under FIR05-00659 resubmittal.
|
Plan resubmittals received | | | 3/14/2006 | | DONE |
|
|
|
This underground modification was resubmitted under FIR05-00659 resubmittal.
|
INSP-Supply line flush | 2/21/2006 | 2/21/2006 | 2/21/2006 | P | PART |
Forrest France
|
|
|
United Water on site to turn valve for UG fire supply line flushing, flush performed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 1/19/2006 | 1/20/2006 | 1/20/2006 | A | FAIL |
Forrest France
|
|
|
The actual UG field installation is entirely different from the submitted and approved plans. This project will require resubmittal of plans reflecting work as installed prior to inspection approval. NOTE: an in line tee has been cut in the existing supply for the new riser and service restored to the existing system without first flushing the UG.
|
INSP-Sprinkler Rough-in | 1/19/2006 | 1/19/2006 | 1/19/2006 | P | NR |
Forrest France
|
|
|
Inspection to be completed on 1/20.
|
Issue and Print Permit | | | 10/4/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/21/2005 | | 9/26/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/21/2005 | | 9/26/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/26/2005 | | 9/26/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/26/2005 | | |
|
|
|
|
Application received | | | 9/21/2005 | | |
|
|
|
|