INSP-Final Inspection | 10/31/2005 | 11/1/2005 | 11/1/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm permit finaled
|
INSP-Final Inspection | 10/25/2005 | 10/27/2005 | 10/27/2005 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was a complete waste of time. Contractor said monitoring was set up at the beginning of the inspection, but after inspecting everything come to find out it wasn't. Up until this point we just couldn't verify batteries were the correct amp hour, duct detectors are not wired for shut down. Need to retest everything.
|
Plan assigned to (Mary) | 9/28/2005 | | 10/20/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 10/20/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/20/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/20/2005 | | 10/20/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/20/2005 | | DONE |
|
|
|
Spoke with Jason and told him that permit is ready & no fees///10/20/05 12:20pm BAS
|
Issue and Print Permit | | | 10/20/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/12/2005 | | DONE |
|
|
|
|
Case Summary | | | 10/12/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 10/10/2005 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Samuel Flores.
|
Application received | | | 9/28/2005 | | |
|
|
|
|
Case Summary | | | 9/28/2005 | | DONE |
|
|
|
|