Permit Information
Permit NumberFIR05-00659
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1445 W COMMERCE AVE
Project NameSPR HAYDEN BEVERAGE
Customer Number 
ePlanReview 
Description
(HAYDEN BEVERAGE-ADDITION) To remove, relocate the existing north (Commerce St.) riser by abandoning existing 6" underground main and re-tapping it 75'-0" north to a new fire sprinkler riser room in the building addition. To modify this relocated riser by adding a 3" wet riser to supply a new vehicle access bay extended antifreeze loop. To remove this relocated existing dry pipe valve to column # "3", approximately 17'-0" feet south of column "H", to feed the two existing separated (8,000-ft/2 total) dry pipe areas west of column line "3". To reconnect the dry system piping to this existing relocated wet system riser #2 and modify the existing offices by relocating and add pendant sprinklers and adding new pendants in a new 1640-ft/2 office on this wet riser. To add a new 6" wet system riser (#6) on the Enterprise St. riser header (near column "N" and "3", FP-4) for the new High Piled Combustible storage warehouse. All work is throughout the one story Type VB, 47,307-ft/2 warehouse/office addition and the existing 82,120-ft/2 (unlimited area warehouse/office) structure. The fire sprinklers are used for the unlimited area. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-00659.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/2/20073/2/20073/2/2007PPASS
DetailsForrest France
Items on correction notices field verified for compliance, fire sprinkler permit finaled.
INSP-Supply line flush1/23/20071/24/20071/24/2007ACANC
DetailsForrest France
BRIAN; Phone #: ###-#### Internet Inspection Request from: Victoria Beall brian cancelled 3:40
Plan assigned to (Bill)7/14/2006 7/26/2006 DONE
DetailsBill Alexander
Sprinkler Plan Check7/14/2006 7/26/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  7/26/2006 DONE
Permit Ready to Issue  7/26/2006 DONE
Issue and Print Permit  7/26/2006 DONE
INSP-Final Inspection7/14/20067/14/20067/14/2006PFAIL
DetailsTroy Cobbley
Forward flush of both backflow preventors passed. Still need to get letter stating it is ok to hang 6" main from a single truss
Plan resubmittals received  7/14/2006  
INSP-Final Inspection7/13/20067/13/20067/13/2006PFAIL
DetailsTroy Cobbley
Fire sprinkler work is not finished yet and updated plans are required.
INSP-Sprinkler Rough-in7/6/20067/7/20067/7/2006APART
DetailsForrest France
Tie-ins to existing system at the west office area are acceptable to cover.
INSP-Sprinkler Rough-in/Hydro7/5/20067/5/20067/5/2006PPART
DetailsForrest France
AG hydrostatic test of the west office area passed.
INSP-Sprinkler Rough-in/Hydro6/29/20066/29/20066/29/2006PPART
DetailsForrest France
OH rough-in at the west office area appears acceptable as installed, however the installation does not match approved plans and will require plans reflecting actual field installation prior to final.
INSP-Final Inspection4/4/20064/5/20064/5/2006ACANC
DetailsTroy Cobbley
No time to complete inspection.
INSP-Final Inspection3/30/20064/3/20064/4/2006ADEFR
DetailsForrest France
Inspection rescheduled.
Issue and Print Permit  3/29/2006 DONE
Permit Ready to Issue  3/28/2006  
Inspection Record Card- Fire3/28/2006 3/28/2006 DONE
Telephone call  3/28/2006 DONE
left mess that permit is ready
Sprinkler Plan Check3/14/2006 3/27/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  3/27/2006 DONE
INSP-Sprinkler Rough-in/Hydro3/14/20063/14/20063/14/2006PCANC
DetailsForrest France
Per S. Rogers, no field inspection is to be performed until the required resubmitted plans are stamped/approved and on site for verification of code compliance.
Plan resubmittals received  3/14/2006  
Plan resubmittals received  3/14/2006 DONE
Telephone call  3/10/2006 DONE
Telcon message from Ron Stenquist, TVFP (3/10/06, 1:51pm) requesting approval for TOC saying they apparently dropped the ball on resubmittals but have completed the required modifications satisfactorily and will have plans submitted to us on Monday. Did not get this message until Monday; as of 3:15 pm on Monday no plans have been resubmitted. Will not agree to TOC. (see telcon notes on BLD05-00775 with Odie, Steed Const)
Note history of failure of AS contractor to respond to written resubmittal requirements in failed inspection CN's on 12/15/05, 1/20/06, 2/15/06 and to keep this recent promise to have resubmittals in by 3/13; cannot issue TOC based on promise to perform by AS contractor.
INSP-Sprinkler Rough-in/Hydro3/3/20063/3/20063/3/2006PPART
DetailsForrest France
Overhead hydrostatic test of the new 3" wet system at the office area is acceptable.
INSP-Sprinkler Rough-in/Hydro3/2/20063/2/20063/3/2006PDEFR
DetailsForrest France
Inspection to be scheduled for 3/3 as discussed with contractor.
INSP-Sprinkler Rough-in/Hydro2/14/20062/14/20062/15/2006PFAIL
DetailsForrest France
Head is overspaced in supply room 124 see NFPA 13 8.6.3.2.4 and 3.3.20, need the correct temp head installed in the server room within direct air flow of the unit heater, need to correct the 4-way EQ brace at 2" main, missing retaining strap at 1 1/4 branch line hanger, provide approved resubmittals reflecting changes showing added DP, changed room layouts, deleted closets, added heads at walls and new 2" line to added heads in the restrooms, rooms on the east side are covered and not inspected at this time, provide verification the exposed wood above the ceiling at the south end is treated, new office area only inspected for rough-in as marked on plans at this time.
INSP-Sprinkler Rough-in/Hydro12/21/200512/22/200512/22/2005APART
DetailsForrest France
Overhead hydrostatic test of the antifreeze system passed. The supply main connection for this area has been changed significantly from the approved plans- system is now fed off the dead end main of the adjacent gridded wet system, not the 3" wet main from the warehouse as shown, need to resubmit plans for approval of this change, an overhead door has also been installed at the adjacent storage area requiring a sw to be installed.
INSP-Sprinkler Rough-in/Hydro12/14/200512/14/200512/15/2005PFAIL
DetailsForrest France
The overhead hydrostatic test for the new refrigerated storage area passed, rough-in for this area needs flexible couplings installed where 6" main passes through the wall, verification that the 6" main can be supported by a single truss as installed, some upright heads are blocked by close proximity to metal truss webs not meeting min. distance requirements from these types of obstructions per NFPA 13 8.6.5.2.1.7.
Permit Ready to Issue  11/1/2005 DONE
Inspection Record Card- Fire11/1/2005 11/1/2005 DONE
Telephone call  11/1/2005 DONE
Left message for Jeff Anderson and told him that permit is ready & fees///11/01/05 9:30am BAS
Issue and Print Permit  11/1/2005 DONE
Plan assigned to (Bill)10/4/2005 10/31/2005 DONE
Sprinkler Plan Check10/4/2005 10/31/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  10/31/2005 DONE
Application received  10/4/2005