Permit Information
Permit NumberFIR05-00667
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameSPR ST LUKES-WEST WING
Customer Number 
ePlanReview 
Description
(ST LUKES-WEST WING)(THIRD FLOOR REMODEL-PHASE B) To add new Q.R. SSP's and replace existing SSU's (shell) to new Q.R. SSP's throughout the remodel a 5,438-ft/2 area located on the south end of the floor for outpatient rooms and offices. Also to relocate an existing 6" standpipe main feeding the rooftop hose connection out of an HVAC shaft. Interior demolition performed under BLD01-01682, of which fire sprinkler permitted work was performed under FIR05-00043 connected to BLD00-02394 (a Seismic Upgrade). This fire sprinkler work is related to include the construction of interior (non-bearing, non-combustible, fire-resistive) walls, to create exam rooms; testing rooms; work rooms and conference / break room in conjunction with medical offices in the main hospital. This building is fully sprinklered. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-01631.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/26/20064/27/20064/27/2006APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in4/11/20064/12/20064/12/2006APART
DetailsForrest France
The remainder of sprinkler relocation work under this permit scope is good for cover as marked on approved plans, final pending ceiling tile and escutcheons.
INSP-Sprinkler Rough-in/Hydro4/11/20064/11/20064/11/2006PDEFR
DetailsForrest France
Scheduled by a contractor via Hello! on 4/11/2006 at 8:37:28 AM. Contact: ###-####.
INSP-Sprinkler Rough-in/Hydro1/16/20061/17/20061/17/2006APART
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 1/16/2006 at 2:23:15 PM. Contact: ###-####.
Sprinkler Plan Check12/7/2005 12/7/2005 PASS
DetailsBill Alexander
Added scope of work
Miscellaneous action  12/7/2005 DONE
Took added scope of work to front desk for calling and releasing.
Telephone call  12/7/2005 DONE
left mess that permit is ready
Telephone call  12/7/2005 DONE
left mess that permit is ready
Telephone call  12/7/2005 DONE
gave permit to brodie
Plan resubmittals received  12/5/2005 DONE
Issue and Print Permit  10/25/2005 DONE
Permit Ready to Issue  10/24/2005 DONE
Inspection Record Card- Fire10/24/2005 10/24/2005 DONE
Telephone call  10/24/2005 DONE
called ###-#### and told Brodie permit is ready and fees
Plan assigned to (Bill)10/5/2005 10/21/2005 DONE
Sprinkler Plan Check10/5/2005 10/21/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  10/21/2005 DONE
Case Summary  10/5/2005 DONE
Application received  10/5/2005