INSP-Final Inspection | 11/3/2005 | 11/4/2005 | 11/4/2005 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
Sprinkler Plan Check | 10/27/2005 | | 11/3/2005 | | PASS |
Bill Alexander
|
|
|
Calculations provided addressing 22'-0" of pipe added friction loss for 3'-0" FlexHead system. (Complete evaluation verification was not provided).
|
Plan assigned to (Bill) | 10/27/2005 | | 11/3/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/3/2005 | | 11/3/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/3/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/3/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/3/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/2/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/26/2005 | | 10/31/2005 | | FAIL |
|
|
|
Submittal provided on Flexhead is different that listing.
|
Miscellaneous action | | | 10/31/2005 | | DONE |
|
|
|
Sent email to Brad Bettcourt of failed submittal.
|
Plan resubmittals received | | | 10/26/2005 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 10/24/2005 | 10/25/2005 | 10/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
Plans do not show the flex heads that have been used. No inspection done. Resubmit plans showing flexheads.
|
Inspection Record Card- Fire | 10/24/2005 | | 10/24/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/24/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 10/24/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/24/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/6/2005 | | 10/21/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/6/2005 | | 10/21/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2005 | | DONE |
|
|
|
|
Application received | | | 10/6/2005 | | |
|
|
|
|
Inspection Record Card- Fire | 10/24/2005 | | | | |
|
|
|
|