INSP-Final Inspection | 11/30/2005 | 11/30/2005 | 12/1/2005 | P | PASS |
Forrest France
|
|
|
c/n items are complete, fire sprinkler passed inspection.
|
INSP-Final Inspection | 11/15/2005 | 11/15/2005 | 11/15/2005 | P | FAIL |
Troy Cobbley
|
|
|
Could not give final inspection a pass due to missing ceiling tile, pendants overspaced in the southend break room and the wrong heads being installed. I spoke to Bruce and told him to get a submittal in that shows the head legend changed and include a new data sheet. Piping can be covered.
|
Issue and Print Permit | | | 11/2/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/1/2005 | | 11/1/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/1/2005 | | DONE |
|
|
|
Spoke with John and told him that permit is ready & fees///11/01/05 9:05am BAS
|
Plan assigned to (Bill) | 10/6/2005 | | 10/31/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/6/2005 | | 10/31/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2005 | | DONE |
|
|
|
|
Case Summary | | | 10/31/2005 | | DONE |
|
|
|
|
Case Summary | | | 10/6/2005 | | DONE |
|
|
|
|
Application received | | | 10/6/2005 | | |
|
|
|
|