Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00686
StatusFinaled
Name M2 AUTOMATION
Site Address 200 N 4TH ST Unit: 102
Project Namealm - Bridge City Legal
Customer Number 
ePlanReview 
Description
To provide total notification in the new TI space located on the 1st floor, Suite 102. Provide a 75 cd as red-lined on sheet 3. Battery calculations appear to be sufficient. No written comments. The PDS Fire Inspector to field verify total visual coverage. Provide revised building map to PDS Fire Inspector with the architectural changes at time of inspection.

The associated building permit (BLD05-02730) is to remodel an existing 1630 sq ft tenant space located on the first floor for a new tenant per approved plans. This space was constructed as a vanilla finish under bld04-01415. It was reduced in size under bld05-02289. The building under went a building code upgrade and was fully fire sprinklered, the corridors are NOT required to be rated. Work under this permit to include, construction of partitions to create two offices, data room & reception area. Relocate existing lighting fixtures add additional outlets. Miscellaneous related interior finishes. This building is fully fire sprinklered and has a fire alarm system, any modifications to the sprinkler system or alarm system WILL require separate permits. (rmh) *(Bridge City Legal)*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/16/200511/17/200511/17/2005APASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Final Inspection11/16/200511/16/200511/16/2005APASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Alarm Testing11/1/200511/4/200511/4/2005APASS
DetailsForrest France
Fire alarm work passed inspection.
Plan assigned to (Mary)10/11/2005 10/20/2005 DONE
Alarm Plan Check  10/20/2005 PASS
Approved pending PDS Fire Inspector field verification. No comments written.
PLANS/APPL TAKEN TO FRONT DESK  10/20/2005 DONE
Permit Ready to Issue  10/20/2005 DONE
Inspection Record Card- Fire10/20/2005 10/20/2005 DONE
Telephone call  10/20/2005 DONE
Spoke with Mike and told him that permit is ready & fees///10/20/05 10:05am BAS
Issue permit  10/20/2005  
Application received  10/11/2005