INSP-Final Inspection | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 1/10/2007 | 1/11/2007 | 1/11/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the single room where the piping is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2006 | 12/18/2006 | 12/18/2006 | P | PASS |
Troy Cobbley
|
|
|
See city approved plans for locations piping is ok to cover.
|
INSP-Sprinkler Rough-in | 12/15/2006 | 12/15/2006 | 12/15/2006 | P | NH |
Forrest France
|
|
|
Lack of access due to construction conditions, inspection not completed.
|
INSP-Sprinkler Rough-in | 11/14/2006 | 11/14/2006 | 11/14/2006 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the east corridor that connects the new area to the existing area is ok to cover.
|
INSP-Final Inspection | 9/13/2006 | 9/13/2006 | 9/15/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the phase II (remodeled existing area) is complete. The new FMC building is complete.
|
INSP-Sprinkler Rough-in | 8/29/2006 | 8/30/2006 | 8/30/2006 | P | PASS |
Troy Cobbley
|
|
|
forward flow test passed
|
INSP-Sprinkler Rough-in | 8/23/2006 | 8/23/2006 | 8/23/2006 | P | PASS |
Troy Cobbley
|
|
|
Remodeled existing area as marked on the plans rough-in passed. Piping is ok for cover
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2006 | 8/17/2006 | 8/17/2006 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed for all floors.
|
INSP-Sprinkler Rough-in | 8/11/2006 | 8/14/2006 | 8/14/2006 | A | PASS |
Troy Cobbley
|
|
|
The east second floor elevator lobby piping is ok to cover and the west second floor stairway piping is ok to cover.
|
INSP-Sprinkler Rough-in | 8/8/2006 | 8/8/2006 | 8/8/2006 | P | PASS |
Troy Cobbley
|
|
|
See approved plans for locations ok to cover the sprinkler piping.
|
INSP-Sprinkler Rough-in | 7/21/2006 | 7/24/2006 | 7/24/2006 | P | PASS |
Troy Cobbley
|
|
|
See approved plans for ceiling areas that are ok to cover.
|
INSP-Sprinkler Rough-in | 6/22/2006 | 6/22/2006 | 6/22/2006 | P | PASS |
Troy Cobbley
|
|
|
The single sprinkler pendant in the east first floor entry lobby is ok to cover.
|
INSP-Sprinkler Rough-in | 6/13/2006 | 6/13/2006 | 6/13/2006 | P | PASS |
Troy Cobbley
|
|
|
Piping located in the second floor north stairwell ceiling is ok to cover (three pendants)
|
INSP-Sprinkler Rough-in/Hydro | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping located above the hard lid ceilings is ok to cover. Exact locations are marked on the approved plans.
|
INSP-Sprinkler Rough-in | 4/4/2006 | 4/4/2006 | 4/4/2006 | P | PASS |
Troy Cobbley
|
|
|
Penthouse piping rough-in passed
|
Sprinkler Plan Check | 3/17/2006 | | 4/3/2006 | | PASS |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 3/17/2006 | | 4/3/2006 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/3/2006 | | 4/3/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/3/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/3/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Issue and Print Permit | | | 4/3/2006 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 3/29/2006 | 3/29/2006 | 3/29/2006 | P | PART |
Troy Cobbley
|
|
|
Rough-in mostly approved. See city approved plans for locations inspected and locations of deficiencies.
|
INSP-Sprinkler Rough-in | 3/15/2006 | 3/16/2006 | 3/16/2006 | A | PASS |
Troy Cobbley
|
|
|
3" pipe rising from the first floor to the penthouse is ok to cover
|
Plan resubmittals received | | | 3/16/2006 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 1/26/2006 | 1/27/2006 | 1/27/2006 | A | PASS |
Troy Cobbley
|
|
|
Remaining underground is ok to cover. The tap to 5'-0" out from the city main is only 4" in size and will require recalculations
|
INSP-Sprinkler Rough-in | 12/6/2005 | 12/7/2005 | 12/7/2005 | A | PART |
Troy Cobbley
|
|
|
Hangers in Grade Link 16007 and 16110 are ok to cover.
|
Inspection Record Card- Fire | 11/4/2005 | | 11/4/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/4/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/4/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 11/4/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/12/2005 | | 11/3/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/12/2005 | | 11/3/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2005 | | DONE |
|
|
|
|
Case Summary | | | 10/12/2005 | | |
|
|
|
|
Application received | | | 10/12/2005 | | |
|
|
|
|