INSP-Final Inspection | 11/28/2005 | 11/28/2005 | 11/28/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work is acceptable, permit finaled.
|
INSP-Final Inspection | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | FAIL |
Forrest France
|
|
|
Plans still not available on site for review or inspection.
|
INSP-Final Inspection | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | FAIL |
Forrest France
|
|
|
The approved stamped plans must be on site for the inspection to be completed.
|
INSP-Sprinkler Rough-in/Hydro | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | FAIL |
Forrest France
|
|
|
The approved stamped plans were not available on site for review, these documents must be available for inspection to be completed.
|
Issue permit | | | 11/15/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/24/2005 | | 11/14/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/14/2005 | | 11/14/2005 | | PASS |
Troy Cobbley
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/14/2005 | | 11/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Miscellaneous action | | | 11/9/2005 | | DONE |
|
|
|
Approved Early Start agreement per new guidelines; copy on file with B.A.
|
Application received | | | 10/24/2005 | | |
|
|
|
|