Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00718
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 800 E PARK BLVD
Project NameMK PLAZA IV-2ND FLR
Customer Number 
ePlanReview 
Description
(HOUSING URBAN DEVELOPMENT)(MK PLAZA IV-STE 220) To add 5 and relocate 7 pendant sprinkler heads in a remodeled tenant space. Building permit is to remodel an existing 4665 sq ft office tenant located on the second floor for a new tenant. Work to include, construction of interior partitions to create small conference rooms, office areas and storage closet, modification to the corridor wall and installation of new rated door assembly, relocation of lighting, new dual level switching requirements in new office areas and conference rooms, relocation of Hvac Diffusers, this building is fully fire sprinklered all alterations to the sprinkler system WILL require a separate permit and shall be installed per NFPA #13 as regulated by the fire department. (rmh). This permit is attached to BLD05-02311.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/28/200511/28/200511/28/2005PPASS
DetailsForrest France
Fire sprinkler work is acceptable, permit finaled.
INSP-Final Inspection11/22/200511/23/200511/23/2005AFAIL
DetailsForrest France
Plans still not available on site for review or inspection.
INSP-Final Inspection11/21/200511/22/200511/22/2005AFAIL
DetailsForrest France
The approved stamped plans must be on site for the inspection to be completed.
INSP-Sprinkler Rough-in/Hydro11/21/200511/22/200511/22/2005AFAIL
DetailsForrest France
The approved stamped plans were not available on site for review, these documents must be available for inspection to be completed.
Issue permit  11/15/2005 DONE
Plan assigned to (Bill)10/24/2005 11/14/2005 DONE
Sprinkler Plan Check11/14/2005 11/14/2005 PASS
DetailsTroy Cobbley
PLANS/APPL TAKEN TO FRONT DESK  11/14/2005 DONE
Permit Ready to Issue  11/14/2005 DONE
Inspection Record Card- Fire11/14/2005 11/14/2005 DONE
Telephone call  11/14/2005 DONE
left mess that permit is ready
Miscellaneous action  11/9/2005 DONE
Approved Early Start agreement per new guidelines; copy on file with B.A.
Application received  10/24/2005