INSP-Final Inspection | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PASS |
Forrest France
|
|
|
Correction issue has been completed, fire sprinkler passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/12/2005 | 12/13/2005 | 12/13/2005 | A | PART |
Forrest France
|
|
|
The DP in the freezer needs to have an escutcheon installed and the annular space in the penetration filled.
|
Override - Parcel Holds | | | 11/7/2005 | | |
|
|
|
|
Issue and Print Permit | | | 11/7/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 11/1/2005 | | 11/4/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/1/2005 | | 11/4/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/2005 | | DONE |
|
|
|
|
Case Summary | | | 11/4/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/4/2005 | | |
|
|
|
|
Inspection Record Card- Fire | 11/4/2005 | | 11/4/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/4/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 11/4/2005 | | |
|
|
|
|
Telephone call | | | 11/4/2005 | | DONE |
|
|
|
tlk to secretary ###-#### that permit and fees are ready to be picked up
|
Application received | | | 11/1/2005 | | |
|
|
|
|