INSP-Final Inspection | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PASS |
Forrest France
|
|
|
Defficient items have been corrected, inspection passed.
|
INSP-Final Inspection | 12/20/2005 | 12/21/2005 | 12/21/2005 | A | FAIL |
Forrest France
|
|
|
Two dampers failed to close upon smoke detection, strobe in the new office is not in sync with the remainder of the floor strobes, discussed this situation with the contractor for pending remodel on this floor.
|
Issue and Print Permit | | | 11/18/2005 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 11/2/2005 | | 11/17/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 11/17/2005 | | PASS |
|
|
|
Approved pending PDS Fire Inspector field verification. No comments written.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/17/2005 | | 11/17/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/17/2005 | | DONE |
|
|
|
Spoke with James and told him that permit is ready & fees///11/17/05 2:25pm BAS
|
Case Summary | | | 11/2/2005 | | DONE |
|
|
|
|
Application received | | | 11/2/2005 | | |
|
|
|
|