INSP-Final Inspection | 6/28/2006 | 6/29/2006 | 6/29/2006 | A | PASS |
Forrest France
|
|
|
Required corrections have been completed, final alarm inspection passed.
|
INSP-Final Inspection | 6/15/2006 | 6/16/2006 | 6/16/2006 | A | CANC |
Forrest France
|
|
|
Per phone call from contractor, inspection to be rescheduled due to jobsite conditions.
|
INSP-Final Inspection | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | FAIL |
Forrest France
|
|
|
Manual pull stations at several locations are installed above max. height allowed, one H/S is overspaced in the open office area, remote indicator for the duct detector in the computer room is non-functional, fire alarm wire at some locations is incorrectly attatched, need to test one duct detector above a confrence room. FACP, nac panel, batteries, phone lines tested okay. Still need to test a/v's, manual pulls, dB, verify signals, etc.
|
Issue and Print Permit | | | 12/13/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/22/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/22/2005 | | 11/22/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/22/2005 | | DONE |
|
|
|
Left voice message for Lynda that permit is ready & fees///11/22/05 @8:40am BAS
|
Plan assigned to (Mary) | 11/4/2005 | | 11/21/2005 | | DONE |
|
|
|
|
Alarm Plan Check | | | 11/21/2005 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2005 | | DONE |
|
|
|
|
Application received | | | 11/4/2005 | | |
|
|
|
|
Case Summary | | | 11/4/2005 | | DONE |
|
|
|
|