Permit Information
Permit NumberFIR05-00772
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6752 S BUSINESS WAY
Project NameSPR FEDEX DISTRIBUTION CENTER
Customer Number 
ePlanReview 
Description
FEDEX GROUND (PACKAGE DISTRIBUTION CENTER) - To install overhead and underground supply fire sprinkler protection work in a new 67,182-ft/2 one story, Type II-B, fully fire sprinklered, unlimited area building. The underground fire service supply is connected off the 10" C-900 loop in the west parking lot running approximately 55'-0" east to a location under the footing and up through the floor approximately 1'-0" above the finished floor, 13'-3" south of building grid #3 and 1'-0" from the inside wall. The overhead system is designed for OH-2 Occupancy with two 6" dry systems and a WPI control. All fire sprinkler system overhead and underground work shall comply with the IFC 2003, the attached review comments/conditions as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-03068.
July 12, 2006 - FEDEX DISTRIBUTION CENTER-OFFICES (PHASE 2) - Install light hazard overhead fire sprinkler protection in the offices located in the southwest corner of a new 67,182-ft/2 one story, Type II-B, fully fire sprinklered, unlimited area building. All fire sprinkler system overhead and underground work shall comply with the IFC 2003, the attached review comments/conditions as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The shell was also installed under this same permit. This permit is attached to building permit: BLD05-03068.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/2/20072/5/20072/5/2007PPASS
DetailsForrest France
Items on previous correction notice have been verified for compliance, final fire sprinkler inspection passed, permit finaled.
INSP-Final Inspection2/1/20072/2/20072/2/2007ACANC
DetailsForrest France
Mike Bierman is the contact @ ###-####. Thank you Phone #: ###-####
INSP-Final Inspection1/31/20072/1/20071/31/2007AFAIL
DetailsForrest France
Need to adjust the tamper switch at the PIV, provide pendent heads in the head box, attatch "911" sign at the outside bell, dry system #2 exceeds allowable trip time per NFPA for the system size (water was delivered to the test connection at 1min. 30 sec.).
INSP-Sprinkler Rough-in/Hydro1/17/20071/18/20071/18/2007APART
DetailsForrest France
System 1 and 2 passed 24 hr. air test, pressure loss at system 2 was within the allowable 1 1/2 psi per NFPA 13.
INSP-Sprinkler Rough-in1/16/20071/17/20071/17/2007APART
DetailsForrest France
Begin 24 hr. air test at 10:00 am, start psi. at system 2 is 40.5, system 1 is 40 psi.
INSP-Sprinkler Rough-in/Hydro1/15/20071/16/20071/16/2007AFAIL
DetailsForrest France
Air test failed due to start pressures below the min. amount allowed per NFPA 13.
INSP-Sprinkler Rough-in/Hydro12/15/200612/18/200612/18/2006APART
DetailsForrest France
OH hydrostatic testing for the two dry systems and the single wet system passed. Also approved the rough-in installation for cover at the office area. Still need to perform 24 hr. air test on the dry systems per NFPA, noted missing flex couplings at the riser and provision for forward flow testing of the BFP.
INSP-Supply line flush12/13/200612/14/200612/14/2006APART
DetailsForrest France
UG fire supply line flush completed.
INSP-Supply line flush12/7/200612/8/200612/8/2006AFAIL
DetailsForrest France
Inspection for the UG fire supply line flush was not completed due to lack of sufficient water flow. Noted the yard PIV was not operating correctly and is installed below allowable 36" height above grade.
INSP-Sprinkler Rough-in/Hydro10/19/200610/20/200610/20/2006PPART
DetailsForrest France
UG fire supply line hydro test is satisfactory.
INSP-Sprinkler Rough-in10/18/200610/18/200610/18/2006PPART
DetailsForrest France
UG fire supply line is okay to cover, need as-builts reflecting yard PIV installation.
Permit Ready to Issue  7/27/2006 DONE
Telephone call  7/27/2006 DONE
spoke to trent@###-####/told permit was ready, permit#, address, project name, and fee
Issue and Print Permit  7/27/2006 DONE
Plan assigned to (Bill)6/5/2006 7/26/2006 DONE
DetailsBill Alexander
Sprinkler Plan Check7/18/2006 7/26/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  7/26/2006 DONE
Plan resubmittals received  7/18/2006 DONE
Telephone call  7/12/2006 DONE
spoke to trent@###-####/told insp failed and can be picked up
Telephone call  7/12/2006 DONE
gave plans to customer with shilo plans failed
Sprinkler Plan Check7/5/2006 7/11/2006 FAIL
DetailsBill Alexander
Re-Submittals Of The Following Items Are Required:
1. Plan submittal is unacceptable since they do not meet minimum requirements of IFC 105.4.2 and BMC 7-01-53-IFC 901.2.
a. Provide full size plans that are scaled and completely legible with minimum 10 point fonts [depending on the plan background cleanliness]),
b. Includes required sections that show elevations of ceiling/s, piping, etc.,
c. Modified riser detail with added wet system that includes all appurtenances/devices;
d. Hangers (include types, locations),
e. Head legend with all manufacturers models and SINumbers installing (uprights adding are not identified),
f. Location of required drain/s, etc.
g. Include areas that will be on the wet system and areas on the dry system, with the dry system number identified.
Plan resubmittals received  7/5/2006 DONE
Plan resubmittals received  6/27/2006 DONE
Sprinkler Plan Check6/26/2006 6/27/2006 PASS
DetailsBill Alexander
Telephone call  6/27/2006 DONE
spoke to lilly@###-####/told permit was ready and no fees
Telephone call  6/27/2006 DONE
gave plans to customer no fee due per bill a.
INSP-Sprinkler Rough-in6/15/20066/16/20066/16/2006APART
DetailsForrest France
UG fire supply line riser and stub-out appears satisfactory, no approved plans on site for verification of pipe size, etc., need to provide means for seismic clearance where the ductile riser will pass through floor slab, need to cover open ended MJ x flange adaptor at riser piece.
Plan assigned to (Bill)11/8/2005 12/8/2005 DONE
Sprinkler Plan Check11/8/2005 12/8/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  12/8/2005 DONE
Permit Ready to Issue  12/8/2005 DONE
Telephone call  12/8/2005 DONE
left mess that permit is ready
Inspection Record Card- Fire12/8/2005 12/8/2005 DONE
Issue and Print Permit  12/8/2005 DONE
Miscellaneous action  12/7/2005 DONE
9:15am-Trent Bice requested this review be moved to the line of Alpine Real Estate T.I. FIR05-00781 and Alpine Real Estate be moved in place of FedEx Distributin Center.
Case Summary  11/8/2005 DONE
Application received  11/8/2005