INSP-Final Inspection | 1/17/2006 | 1/17/2006 | 1/18/2006 | P | PASS |
Forrest France
|
|
|
Corrections are finished, inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2006 | 1/10/2006 | 1/10/2006 | P | FAIL |
Forrest France
|
|
|
One hanger attatchment on an arm-over is improperly installed, need to final the shell permit prior to approval of this TI permit, field ceiling tile should not be installed previous to an overhead rough-in inspection.
|
Issue permit | | | 12/15/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/9/2005 | | 12/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/9/2005 | | DONE |
|
|
|
tlk to steve johnson ###-#### that permit and fees are ready to be picked up
|
Plan assigned to (Bill) | 11/14/2005 | | 12/8/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/14/2005 | | 12/8/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2005 | | DONE |
|
|
|
|
Case Summary | | | 11/14/2005 | | |
|
|
|
|
Application received | | | 11/14/2005 | | |
|
|
|
|