INSP-Final Inspection | 6/22/2006 | 6/22/2006 | 6/22/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 6/22/2006 | 6/22/2006 | 6/22/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 6/22/2006 | 6/22/2006 | 6/22/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 5/24/2006 | 5/24/2006 | 5/24/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2006 | 5/24/2006 | 5/24/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground supply hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/19/2006 | 5/19/2006 | 5/19/2006 | P | CANC |
Troy Cobbley
|
|
|
No time for inspection. Will need to be rescheduled.
|
INSP-Sprinkler Rough-in | 3/15/2006 | 3/16/2006 | 3/16/2006 | P | PASS |
Troy Cobbley
|
|
|
UG inside of building is ok to cover
|
INSP-Sprinkler Rough-in | 3/15/2006 | 3/15/2006 | 3/15/2006 | P | PASS |
Troy Cobbley
|
|
|
Exterior portion of underground supply is ok to cover
|
FIR-Aging Inspection | 2/20/2006 | 2/20/2006 | 2/21/2006 | | NR |
Troy Cobbley
|
|
|
Work as shown on this permit has been modified and shown on the overhead permit. Will verify installation with approved overhead drawings when ready and final.
|
Issue and Print Permit | | | 11/21/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/18/2005 | | 11/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/18/2005 | | DONE |
|
|
|
###-#### - tlk to jeff that permit and fees are ready to be picke dup
|
Plan assigned to (Bill) | 11/15/2005 | | 11/17/2005 | | PASS |
|
|
|
quick permit for new UG; approved subject to satisfactory inspection per NFPA 13 and 24.
|
Application received | | | 11/15/2005 | | |
|
|
|
|