INSP-Final Inspection | 9/1/2006 | 9/1/2006 | 9/1/2006 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 5/24/2006 | 5/24/2006 | 5/24/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2006 | 5/24/2006 | 5/24/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground supply hydro test passed.
|
Plan assigned to (Bill) | 11/17/2005 | | 5/11/2006 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 1/27/2006 | 1/27/2006 | 1/27/2006 | P | PASS |
Troy Cobbley
|
|
|
underground supply is ok to cover. A 45 has been added to the underground supply
|
Issue and Print Permit | | | 12/1/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/30/2005 | | 11/30/2005 | | PASS |
|
|
|
Plans approved as noted. No written comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/30/2005 | | 11/30/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/30/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Application received | | | 11/17/2005 | | |
|
|
|
|