| INSP-Final Inspection | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
| INSP-Final Inspection | 1/11/2007 | 1/11/2007 | 1/11/2007 | P | FAIL |
Troy Cobbley
|
|
|
All of the strobes are mounted too low. No testing performed.
|
| (F) Reprint permit | | | 11/8/2006 | | DONE |
|
|
|
|
| Inspection Record Card- Fire | 11/7/2006 | | 11/7/2006 | | DONE |
|
|
|
|
| Telephone call | | | 11/7/2006 | | |
|
|
|
t/c w Charlie Bayne at ###-####- permit ready and no fees (phase one)
|
| Miscellaneous action | | | 11/7/2006 | | |
|
|
|
Conducted Phase One Fire Alarm System As-Built Review. The phase one fire alarm system scope of work on this project has been accepted by the field inspector. A Phase One temoprary occupancy has been issued. As-Built drawings reflecting changes made durring the project
|
| INSP-Final Inspection | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the phase II (remodeled existing area) is complete. The new FMC building is complete.
|
| INSP-Alarm Testing | 9/13/2006 | 9/13/2006 | 9/13/2006 | A | FAIL |
Troy Cobbley
|
|
|
The a/v's need to be exchanged in the ICU area and the nomanclature needs to be changed at the riser room devices as discussed. All other items on the correction notice have been corrected.
|
| Miscellaneous action | | | 9/13/2006 | | DONE |
|
|
|
Received fax dated 9/1/06 from McCarthy indicating the WANdoor is not smoke rated, therefore smoke detector activation of the door is not required. However, Dan Stuart, plan reviewer determined that the door requires a smoke acitvated closer per IFC 1008.1.3.3 and the ES Listing report ER-3890, copy attached to approved plans. This responds to comment #1 on the 8/10/06 fire alarm modification plan review.
|
| INSP-Alarm Testing | 9/5/2006 | 9/6/2006 | 9/6/2006 | A | DONE |
Troy Cobbley
|
|
|
See the city approved plans for devices tested today which included the induct detectors and duct detectors for unit shutdown. Per the mechanical contractor the max cfm in the trunk lines is roughly 1200. The simplex detectors are listed to 2000cfm.
|
| INSP-Alarm Testing | 8/30/2006 | 8/31/2006 | 8/31/2006 | P | DONE |
Troy Cobbley
|
|
|
See city approved plans for locations of devices tested and problems found. This was only a partial test.
|
| Issue and Print Permit | | | 8/16/2006 | | |
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2006 | | DONE |
|
|
|
|
| Permit Ready to Issue | | | 8/15/2006 | | DONE |
|
|
|
|
| Telephone call | | | 8/15/2006 | | DONE |
|
|
|
left vm for charlie@###-####/told permit was ready, permit#, project name & address, and fee
|
| Alarm Plan Check | 8/3/2006 | | 8/10/2006 | | PASS |
|
|
|
Plan modification - 8/3/06 mailed to F. Varley. 8/10/06 - Approved by F. Varley. Plans previously approved and sent back in after the engineers made changes to locations of some devices. No cut sheets were provided. I re-approved it with a few comments as additions to the original review. It is the third time the plans have been through the system; $150 review fee applies.
|
| Plan resubmittals received | | | 7/31/2006 | | |
|
|
|
|
| FIR-Aging Inspection | 6/28/2006 | 6/28/2006 | 6/29/2006 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
| CHANGE STATUS TO (ISS) | | | 3/29/2006 | | DONE |
|
|
|
fees were not put in permit when customer was picking up this is why is changed the status to issued....i put fees in & billed them
|
| Issue permit | | | 3/29/2006 | | DONE |
|
|
|
|
| Issue and Print Permit | | | 3/29/2006 | | DONE |
|
|
|
|
| Inspection Record Card- Fire | 3/27/2006 | | 3/27/2006 | | DONE |
|
|
|
|
| Permit Ready to Issue | | | 3/27/2006 | | DONE |
|
|
|
|
| Telephone call | | | 3/27/2006 | | |
|
|
|
lft vm with charlie ###-#### that permit and fees are ready to be picked up
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2006 | | DONE |
|
|
|
|
| Plan assigned to (Mary) | 11/22/2005 | | 3/25/2006 | | DONE |
|
|
|
|
| Alarm Plan Check | | | 3/24/2006 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
| Plan resubmittals received | | | 3/10/2006 | | DONE |
|
|
|
|
| Alarm Plan Check | | | 3/4/2006 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Charlie Bayne.
|
| Plan resubmittals received | | | 2/17/2006 | | |
|
|
|
|
| Alarm Plan Check | | | 12/7/2005 | | FAIL |
|
|
|
No written comments. I marked up the drawings and called Charlie Bayne (Simplex) to let him know the plans have been rejected. His comments will consist of Charlie marking up his own set of drawings.
|
| Application received | | | 11/22/2005 | | |
|
|
|
|
| Case Summary | | | 11/22/2005 | | DONE |
|
|
|
|