INSP-Final Inspection | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/18/2007 | 1/19/2007 | 1/19/2007 | P | FAIL |
Troy Cobbley
|
|
|
Need as-builts and the existing door holders connected to the corridor smoke detectors and shown on the as builts
|
INSP-Final Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 | P | PART |
Troy Cobbley
|
|
|
The second floor portion of the fire alarm system is passed. Still need to test the connection between the new NAC and the main FACP.
|
INSP-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was for occupancy on the second floor. Before approval for the second floor the manual pull station at the east stairwell needs to be lowered and the smoke detector near the elevator lobby reception desk needs relocated away from the supply grill. I also need a print out of the signals that ADT received and to test the supervision of the new NAC panel on the second floor. First floor will need to be tested and the smoke fire damper on the fifth floor. Elevator recall functioned correctly for the machine room, shaft, first floor and second floor.
|
CHANGE STATUS TO (ISS) | | | 6/27/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/27/2006 | | DONE |
|
|
|
|
FIR-Aging Inspection | 6/16/2006 | 6/16/2006 | 6/23/2006 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
Inspection Record Card- Fire | 6/21/2006 | | 6/21/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/21/2006 | | DONE |
|
|
|
left vm for charlie bayne @###-####/let him know that the permit is ready and fee associated with it.
|
Permit Ready to Issue | | | 6/21/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 6/20/2006 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/8/2006 | | |
|
|
|
|
Issue and Print Permit | | | 2/15/2006 | | |
|
|
|
|
Plan assigned to (Mary) | 11/22/2005 | | 2/13/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 2/13/2006 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/13/2006 | | 2/13/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/13/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/13/2006 | | |
|
|
|
called ###-#### and told charlie that permit is ready and fee
|
Plan resubmittals received | | | 1/19/2006 | | |
|
|
|
|
Application received | | | 11/22/2005 | | |
|
|
|
|
Case Summary | | | 11/22/2005 | | DONE |
|
|
|
|