Permit NumberFIR05-00806
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameSPR B24-F4B MURATIC STOCK
Customer NumberC8655
ePlanReview 
Description
DEMOLITION/INSTALLATION - MICRON B24 F4B (C8655) MURATEC STOCKERS AND AUTOMATION SYSTEM - This is a (3) phased with demolition permit. PHASE #1 is for removing 13 SSP's heads with piping in the ceiling, 10 SSU"s heads with piping in the interstitial (under catwalk). PHASE #2 is for the Muratec Install which entails the installation of 16 new SSP's with piping in the ceiling, and 5 new SSU's with piping in the lower interstitial (under catwalk). PHASE #3 is to relocate 28 existing SSP's on FlexHead® piping and install 6 new SSP's and piping in the ceiling. The location and coverage of heads will require 31 baffles to prevent cold soldering, all for the installation of Muratec Stockers and Automation System. The fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permitted work scope is attached to BLD05-03247.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/16/20087/17/20087/17/2008APASS
DetailsForrest France
Required corrections verified for completion, final field inspection passed, fire sprinkler permit finaled.
INSP-Final Inspection7/11/20087/14/20087/14/2008PFAIL
DetailsTroy Cobbley
One pendant is missing and one pendant needs to be relocated 8" back to its original location and the 45 degree brace relocated or removed. These two items are in Service Bay 2459 and have been marked on the clean room copies of the city approved plans.
Sprinkler Plan Check  3/20/2008 DONE
On site review of additional plan modifications by T. Cobbley.
PLANS/APPL TAKEN TO FRONT DESK  3/10/2008 DONE
On site review of Plan modification, 27 heads involved.
Issue and Print Permit  3/10/2008 DONE
Plan resubmittals received  3/6/2008 PASS
Onsite review by T. Cobbley. Plan modification, 27 heads involved.
FIR-Aging Inspection10/2/200610/2/200610/3/2006 DONE
DetailsForrest France
Notified contractor to schedule inspection.
Plan assigned to (Bill)2/27/2006 3/1/2006 DONE
DetailsBill Alexander
Sprinkler Plan Check2/24/2006 3/1/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  3/1/2006 DONE
Issue and Print Permit  3/1/2006 DONE
Plan resubmittals received  2/24/2006 DONE
DetailsBill Alexander
Plan phase modifications
Issue and Print Permit  2/22/2006 DONE
Sprinkler Plan Check2/16/2006 2/21/2006 FAIL
DetailsBill Alexander
Re-Submittals of the Following Items Are Required-(02/16/06):
1. Provide (listing) materials data submittals for "water shields" and addressing the same as acceptable with sprinkler head (VK102) installing.

2. Provide correct hanger information on the plans for "Stocker" piping.

3. Provide (listing) materials data submittals on control valve and tamper supervision for "Stocker" protection control valve.
Plan resubmittals received  2/16/2006  
DetailsBill Alexander
2nd Phase
Sprinkler Plan Check1/27/2006 1/30/2006 FAIL
DetailsBill Alexander
2nd review, plan modifications. Previously approved stamped plans missing.
Plan resubmittals received  1/27/2006  
2nd Phase
Plan assigned to (Bill)11/23/2005 12/14/2005 DONE
DetailsBill Alexander
Sprinkler Plan Check11/23/2005 12/14/2005 PASS
DetailsBill Alexander
Demoliton Work Only
PLANS/APPL TAKEN TO FRONT DESK  12/14/2005 DONE
Application received  11/23/2005 DONE