INSP-Final Inspection | 8/14/2006 | 8/14/2006 | 8/14/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/16/2006 | 1/18/2006 | 1/18/2006 | A | PART |
Troy Cobbley
|
|
|
WRONG PERMIT. INSPECTION WAS PUT IN FIR05-00586 BY JW ALEXANDER
Roughin in general looks ok but per note #7 the plans need to be resubmitted with a 30% increase in the size of the remote area due to the deck slope. This may effect pipe sizing. The only items inspected was the sprinkler piping inside the canopy itself.
|
Issue and Print Permit | | | 12/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/30/2005 | | 11/30/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/30/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Application received | | | 11/29/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 11/29/2005 | | 11/29/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/29/2005 | | 11/29/2005 | | PASS |
|
|
|
Plans approved with no comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2005 | | DONE |
|
|
|
|