INSP-Final Inspection | 3/13/2006 | 3/14/2006 | 3/14/2006 | A | PASS |
Forrest France
|
|
|
Items on the previous correction notice have been completed, fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/10/2006 | 3/10/2006 | 3/10/2006 | P | FAIL |
Forrest France
|
|
|
Heads at two locations are painted and will require replacement at the confrence room 101 and office 102, surface mounted lights in the work room 104 obstruct two sprinklers at this location.
|
INSP-Sprinkler Rough-in/Hydro | 1/4/2006 | 1/4/2006 | 1/4/2006 | P | PART |
Forrest France
|
|
|
Overhead rough-in is good for cover at the hard lid areas.
|
Permit Ready to Issue | | | 12/20/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/20/2005 | | 12/20/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/20/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue and Print Permit | | | 12/20/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 11/30/2005 | | 12/19/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/12/2005 | | 12/19/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/12/2005 | | |
|
|
|
|
Sprinkler Plan Check | 12/2/2005 | | 12/2/2005 | | FAIL |
Troy Cobbley
|
|
|
Plans failed. Review comments faxed to contractor.
|
Application received | | | 11/30/2005 | | |
|
|
|
|