Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR05-00817
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 398 S 9TH ST Unit: 250
Project NameBODO BLDG #4 - SPR
Customer Number 
ePlanReview 
Description
To modify fire sprinkler protection for a new office and outside due to blocked upright sprinkler heads in the creation of a new 1,711-ft/2 office tenant space located on the 2nd floor of BODO Building #4. The fire sprinkler work is related to new interior nonbearing walls, a restroom/shower room and gypsum board ceilings. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This tenant cannot be finaled until the shell has been finaled. This permit is attached to BLD05-02316.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/13/20063/14/20063/14/2006APASS
DetailsForrest France
Items on the previous correction notice have been completed, fire sprinkler permit finaled.
INSP-Final Inspection3/10/20063/10/20063/10/2006PFAIL
DetailsForrest France
Heads at two locations are painted and will require replacement at the confrence room 101 and office 102, surface mounted lights in the work room 104 obstruct two sprinklers at this location.
INSP-Sprinkler Rough-in/Hydro1/4/20061/4/20061/4/2006PPART
DetailsForrest France
Overhead rough-in is good for cover at the hard lid areas.
Permit Ready to Issue  12/20/2005 DONE
Inspection Record Card- Fire12/20/2005 12/20/2005 DONE
Telephone call  12/20/2005 DONE
left mess that permit is ready
Issue and Print Permit  12/20/2005 DONE
Plan assigned to (Bill)11/30/2005 12/19/2005 DONE
Sprinkler Plan Check12/12/2005 12/19/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  12/19/2005 DONE
Plan resubmittals received  12/12/2005  
Sprinkler Plan Check12/2/2005 12/2/2005 FAIL
DetailsTroy Cobbley
Plans failed. Review comments faxed to contractor.
Application received  11/30/2005