Permit Information
Permit NumberFIR05-00819
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 601 W GOWEN RD
Project NameSPR WESTERN POWER SPORTS ADD
Customer Number 
ePlanReview 
Description
WESTERN POWER SPORTS - WAREHOUSE ADDITION * To add two, 6" wet overhead fire sprinkler systems, protecting Palletized or Solid Piled Storage of Class I through IV Commodities to 20'-0", incorporating EFSR heads, within a new 48,600 sq. ft. one story Type IIB warehouse addition located on the west side of the existing building. The water supply will be connected to an existing Aurora 6-481-188, 105 psi/1500 gpm rated booster pump, and a (current) United Water supply of 55 static, 3,500 gpm flow @ 20 psi, located in existing riser room which was installed under shell permit FIR01-00031, modified later under FIR02-00477 for adding racks within a 106,964 ft/2 type II-N building permitted for B, S1, A3 occupancies. (The original design was with a water supply quoted at 62 static, 1,500 @ 20 psi). The building is fully fire sprinklered with an unlimited area designation. Any racking over 8'-0" will require separate plans and permits prior to installation. Also separate plans and permits required for the above ground water tank used for fire flow. All fire sprinkler overhead and related work shall comply with the IFC 2003, the attached review comments/conditions; all regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-02148.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/15/20066/16/20066/16/2006APASS
DetailsForrest France
Required corrections have been made and verified for completion, final inspection for the permitted work passed.
INSP-Sprinkler Rough-in/Hydro5/12/20065/15/20065/15/2006APART
DetailsForrest France
Overhead hydrostatic test performed satisfactory. Need to provide correct spacing of pendent heads in the expanded office area, ESFR heads are blocked by ductwork at two locations, provide both high and intermediate temp heads in the head box.
Plan assigned to (Bill)11/30/2005 1/23/2006 DONE
Sprinkler Plan Check1/4/2006 1/23/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/23/2006 DONE
Inspection Record Card- Fire1/23/2006 1/23/2006 DONE
Permit Ready to Issue  1/23/2006 DONE
Telephone call  1/23/2006 DONE
tlk to trent ###-#### shilo that permit and fees are ready to be picked up 3:03 pm
Issue and Print Permit  1/23/2006 DONE
Plan resubmittals received  1/4/2006 DONE
Sprinkler Plan Check11/30/2005 12/21/2005 FAIL
DetailsBill Alexander
Submittals Of The Following Items Are Required:
1. Prior to addressing this facilities additions fire protection system, the designer must provide a current High Piled Combustible Storage form filled out, addressing all aspects of this projects proposed occupancy use, relating to the commodities stored, etc. Please reference IFC 2301.3.

Forms may be obtained on the web site at:
http://www.cityofboise.org/pds/applications/Fire/High_Piled.pdf
and I have also attached one to this return.

2. Provide the existing warehouse approved Calculation Design Cover Sheets (all applicable) and the original water supply information those designs were calculated with (including Fire Booster Pump rating).
This information is required to verify current water supply information (differences) and the need for fire hydrant flow meeting the requirements of IFC B105.2.
NOTE A: The required fire flow for the sprinklered, structure with the 50% reduction allowed for sprinklers is 4000 gpm; the available flow is only 2750 gpm. A letter from the architect, requesting exemption from this requirement, was included with the permit application and has been forwarded to the Fire Marshal for consideration. The required fire flow must be met unless an acceptable alternative is approved by the Chief.
NOTE B: One acceptable solution would be an on-site storage tank with a 4-hour flow capacity; which would be 960,000 gallon capacity.

No Further Review can be made without the above information available.
Miscellaneous action  12/21/2005 DONE
Returned documents for returning and addressing
Telephone call  12/21/2005 DONE
called Trent's Cell ###-#### and left voicemessage to pick up plans
Application received  11/30/2005  
Case Summary  11/30/2005 DONE