INSP-Final Inspection | 1/19/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
INSP-Sprinkler Rough-in | 1/10/2007 | 1/11/2007 | 1/11/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the corridor and side room where the piping is ok to cover
|
INSP-Sprinkler Rough-in | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping ok to cover
|
INSP-Sprinkler Rough-in | 11/2/2006 | 11/3/2006 | 11/3/2006 | A | PART |
Forrest France
|
|
|
Two heads at the 1st floor corridor drop ceiling adjacent to the seismic separation assembly are good for cover.
|
INSP-Final Inspection | 7/7/2006 | 7/7/2006 | 7/7/2006 | A | PART |
Troy Cobbley
|
|
|
The second floor sprinkler system is completed and approved.
|
INSP-Final Inspection | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | CANC |
Troy Cobbley
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
INSP-Sprinkler Rough-in | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | PASS |
Troy Cobbley
|
|
|
All remaining piping is ok to cover
|
INSP-Sprinkler Rough-in | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | PASS |
Troy Cobbley
|
|
|
The single sprinkler pendant located in the new soffit in the entry lobby is .ok to cover
|
INSP-Sprinkler Rough-in | 4/19/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Additional sprinkler protection may be needed on the east side of the elevators when costruction is complete. Also existing/new corridor connection still needs addressed with sprinkler coverage.
|
INSP-Sprinkler Rough-in | 4/19/2006 | 4/19/2006 | 4/19/2006 | P | CANC |
Troy Cobbley
|
|
|
No time for the inspection today. To be rescheduled for tomorrow
|
FIR-Aging Inspection | 4/10/2006 | 4/10/2006 | 4/12/2006 | | NR |
Troy Cobbley
|
|
|
Work in progress
|
Issue and Print Permit | | | 12/19/2005 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/2/2005 | | 12/16/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/2/2005 | | 12/16/2005 | | PASS |
Troy Cobbley
|
|
|
Approved with comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/16/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/16/2005 | | 12/16/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/16/2005 | | |
|
|
|
|
Telephone call | | | 12/16/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Case Summary | | | 12/2/2005 | | DONE |
|
|
|
|
Application received | | | 12/2/2005 | | |
|
|
|
|