INSP-Final Inspection | 3/21/2007 | 3/22/2007 | 3/22/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/23/2006 | 3/24/2006 | 3/24/2006 | A | PART |
Troy Cobbley
|
|
|
Fire sprinkler can be finaled when shell core is ready
|
Issue and Print Permit | | | 3/16/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/21/2006 | | 3/15/2006 | | PASS |
Bill Alexander
|
|
|
Corrections/Verifications Required:
1. This floor has 274 - Viking Model "Microfast", Q.R., SSU, 5.6 K-factor, (½"), VK300 of which this tenant area is adding 2 more. These sprinklers are not listed for pressures in excess of 175 psi. This tenant shall be fitted with approve SSU fire sprinklers that meet the shell systems current performance pressure performance design available with IFC Fire/Life Safety Inspector verifying by submittals and installation matching the same. (NFPA 13-6.13)
2. All pipe and fittings incorporating in this tenant shall also be required to meet the 13-6.1.3 and 6.4.4. Data submittals shall also be required to the IFC Fire/Life Safety Inspector matching the existing and new modification addressed under this permit.
3. This facility has a fire pump and maximum static or flowing pressure exceeds 100 psi. Branch line above a ceiling supplying pendent sprinklers below the ceiling shall have hanger assemblies on all end or offset sprinkler, to prevents upward movement of the pipe. (NFPA 13-9.2.3.4.3.1)
4. Occupancy is not permitted until FIR05-00425 incorporating the High Rise with secondary water supply has been finaled.
|
Miscellaneous action | | | 3/15/2006 | | DONE |
|
|
|
Took revised plans to permit desk for releasing. 2nd review, no fees.
|
Case Summary | | | 3/15/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/15/2006 | | |
|
|
|
Informed Catherine (Debest Fire Protection) ###-#### to pick up permit; permit previously issued, scope has not changed, 2nd review - no fee per Bill Alexander 3-15-06 eus
|
Permit Ready to Issue | | | 3/15/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 3/15/2006 | | 3/15/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/21/2006 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 2/16/2006 | 2/17/2006 | 2/17/2006 | A | FAIL |
Forrest France
|
|
|
The approved stamped plans do not reflect the actual field installation, a drop ceiling is indicated on approved plans, however the space has been completed and installed with uprights for an OTS ceiling. As installed the uprights are blocked by beams and overspaced in certain locations, need to remove the uprights above the restroom hard lids, provide plan resubmittal reflecting accurate information regarding construction details and correct sprinkler layout prior to next inspection.
|
Permit Ready to Issue | | | 12/21/2005 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/21/2005 | | 12/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Issue and Print Permit | | | 12/21/2005 | | |
|
|
|
|
Plan assigned to (Bill) | 12/7/2005 | | 12/20/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/7/2005 | | 12/20/2005 | | PASS |
Troy Cobbley
|
|
|
Approved as noted. No written comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2005 | | DONE |
|
|
|
|
Application received | | | 12/7/2005 | | |
|
|
|
|