DOC - Permit Finaled | | | 2/17/2006 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 2/9/2006 | | 2/16/2006 | | PASS |
Bill Alexander
|
|
|
Field modifications
|
Plan resubmittals received | | | 2/9/2006 | | DONE |
|
|
|
Field Revisions
|
INSP-Final Inspection | 1/25/2006 | 2/2/2006 | 2/2/2006 | P | FAIL |
Forrest France
|
|
|
Heat collector has been provided on one head (provide listing), one sprinkler head exceeds 22" from the deck, sprinkler heads may be required in each beam pocket, sprinkler piping installed is 1 1/2 plans show 2".
|
Plan assigned to (Bill) | 12/8/2005 | | 12/14/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/8/2005 | | 12/14/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2005 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/14/2005 | | DONE |
|
|
|
|
Application received | | | 12/8/2005 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|