Permit NumberFIR05-00850
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2791 S VICTORY VIEW WAY
Project NameSPR UG C2 ENTERPRISES
Customer Number 
ePlanReview 
Description
C2 ENTERPRISES (UNDERGROUND) * - To install approximately 310'-0" of 6" C-900 PVC, connected in Victory View. The supply runs approximately 155'-0" north, then west approximately 15'-0" to a location 21'-2" east of the north end of the structure, then south under the footing and up through the floor approximately 6" with 6" Ductile Iron with an M.J. adapter. This fire service supply line is feeding fire water to a new 12,941-ft/2 one story Type V-B fully fire sprinkled office retail shell building with three tenant spaces of 1944-ft/2, 1944-ft/2 and 9053-ft/2 respectfully. Fire sprinklers will be used for area. The 9,053-ft/2 tenant space is permitted under BLD05-02759. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD05-02758.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/1/20066/1/20066/1/2006PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush5/3/20065/3/20065/3/2006PPASS
DetailsTroy Cobbley
Underground flush passed. Underground hydro test passed.
INSP-Sprinkler Rough-in5/2/20065/2/20065/2/2006PPASS
DetailsTroy Cobbley
underground hydro test passed
INSP-Sprinkler Rough-in4/13/20064/14/20064/14/2006PPASS
DetailsTroy Cobbley
A remaining underground supply piping is ok to cover.
INSP-Sprinkler Rough-in3/29/20063/29/20063/29/2006PPART
DetailsTroy Cobbley
Underground from the tap to the northeast corner of the building where the PIV is to be located is ok to cover.
INSP-Sprinkler Rough-in/Hydro1/4/20061/5/20061/5/2006PPART
DetailsTroy Cobbley
Underground stub out from building is ok to cover only.
Issue and Print Permit  12/19/2005 DONE
Permit Ready to Issue  12/16/2005 DONE
Inspection Record Card- Fire12/16/2005 12/16/2005 DONE
Telephone call  12/16/2005 DONE
left mess that permit is ready
Plan assigned to (Bill)12/9/2005 12/15/2005 DONE
Sprinkler Plan Check12/9/2005 12/15/2005 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  12/15/2005 DONE
Application received  12/9/2005