INSP-Final Inspection | 4/6/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
Forrest France
|
|
|
Items on correction notice have been completed as required, fire sprinkler finaled.
|
INSP-Final Inspection | 4/4/2006 | 4/6/2006 | 4/6/2006 | A | CANC |
Troy Cobbley
|
|
|
No time to complete this inspection today, to be rescheduled per agreement with contractor.
|
INSP-Sprinkler Rough-in/Hydro | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PART |
Troy Cobbley
|
|
|
Hydro test passed. Sprinkler roughin passed. Tie in to the existing sprinkler piping still needs to be verified as well as the fourway bracing at the top of the riser and the connection. Need to perform the forward flush and provide annual inspection for the existing riser.
|
Telephone call | | | 1/11/2006 | | DONE |
|
|
|
lft vm with brad bettencourt ###-#### that permit and no fees are ready to be picked up 8:31 am
|
Sprinkler Plan Check | 1/9/2006 | | 1/10/2006 | | PASS |
Bill Alexander
|
|
|
Modification - Adding new forward flow test piping for the backflow preventer.
|
Miscellaneous action | | | 1/10/2006 | | DONE |
|
|
|
Took resubmittal of added work to the front desk for issueing. 2nd review, no fee.
|
Plan resubmittals received | | | 1/9/2006 | | |
|
|
|
|
Issue and Print Permit | | | 1/4/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/3/2006 | | 1/3/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/3/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/12/2005 | | 12/30/2005 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/12/2005 | | 12/30/2005 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2005 | | DONE |
|
|
|
|
Case Summary | | | 12/12/2005 | | |
|
|
|
|
Application received | | | 12/12/2005 | | |
|
|
|
|