Description
To provide total notification and two duct detectors for HVAC in the remodeled area on the second floor. The fire alarm application states this space to be "phased", no EOLs for phasing are indicated on the plans or riser. Therefore, the PDS Fire Inspector shall field verify phase I based on the red-lines presented on the approved plans at time of inspection. A building map shall be provided fore Phase I then revised when Phase II is completed.

2/23/2006 - Plan Modification. The NAC circuits were revised to a four wire appliance to accommodate synchronization with the existing audibility in the building.

3/25/2006 - Plan Modification. Two additional duct smoke detectors are added in rooms 208 and 210.

The building permit BLD05-02634 is to remodel and expand an existing medical office space from 1,141 sq.ft. to 2,433 sq.ft. To perform selective interior demolition. To construct interior walls to relocate the reception / waiting area, to add a new dr. office several new exam rooms and support areas. A work shall be done in compliance with Type 1A construction, maintaining all existing fire-resistive systems and the existing 1-hour exit corridor between the existing two stair enclosures. Ther is an existing unisex restroom in this space and two existing common use restrooms in the common area. This building is fully sprinklered. A new Certificate of Occupancy is required as a condition of this permit before the new area can be legally occupied. (drs) (TREASURE VALLEY ENDOCRINOLOGY)(ST AL'S OFFICE BLDG #5-2ND FLR)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/30/20063/31/20063/31/2006PPASS
DetailsTroy Cobbley
Permit finaled
Issue and Print Permit  3/29/2006 DONE
Inspection Record Card- Fire3/27/2006 3/27/2006 DONE
Permit Ready to Issue  3/27/2006  
Telephone call  3/27/2006 DONE
ft vm with charlie ###-#### that permit and fees are ready to be picked up
Alarm Plan Check  3/25/2006 PASS
Plan Modification. Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  3/25/2006  
Plan resubmittals received  3/21/2006  
Alarm Plan Check  2/23/2006 PASS
Plan Modification. Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  2/23/2006 DONE
Permit Ready to Issue  2/23/2006  
Inspection Record Card- Fire2/23/2006 2/23/2006 DONE
Telephone call  2/23/2006  
Informed Melissa (Simplex Grinnell) ###-#### to pick up permit 2-23-06 eus
CHANGE STATUS TO (ISS)  2/23/2006  
(F) Reprint permit  2/23/2006 DONE
Plan resubmittals received  2/7/2006  
INSP-Final Inspection1/24/20061/25/20061/25/2006APART
DetailsTroy Cobbley
Phase one area complete and ok to occupy. Need to test NAC panel and EOL when phase two is done. Provide sync'ing of the strobes in corridor (exit path from the remodeled space).
INSP-Final Inspection1/12/20061/12/20061/12/2006ACANC
DetailsTroy Cobbley
Alarm problems. Contractor not ready.
Inspection Record Card- Fire12/28/2005 12/28/2005 DONE
Permit Ready to Issue  12/28/2005 DONE
Telephone call  12/28/2005 DONE
charlie called us, told him permit is ready and fee
Issue and Print Permit  12/28/2005 DONE
Plan assigned to (Mary)12/13/2005 12/27/2005 DONE
Alarm Plan Check  12/27/2005 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  12/27/2005 DONE
Case Summary  12/13/2005 DONE
Application received  12/13/2005