INSP-Final Inspection | 4/12/2006 | 4/13/2006 | 4/13/2006 | P | PASS |
Forrest France
|
|
|
c/n items are completed, final testing passed inspection, permit finaled.
|
INSP-Final Inspection | 4/7/2006 | 4/10/2006 | 4/10/2006 | P | FAIL |
Forrest France
|
|
|
Heads at two locations as marked on approved plans are blocked by surface mounted light obstructions, the elevator shaft has been deleted and divided to form two separate rooms which will require protection per NFPA 13D, witnessed satisfactory UG flush, missing canopy installed while on site.
|
INSP-Sprinkler Rough-in | 1/24/2006 | 1/24/2006 | 1/24/2006 | P | PART |
Forrest France
|
|
|
Overhead rough-in is acceptable to cover, the three dsw at the garage are not installed at this time, riser is not installed.
|
Telephone call | | | 1/24/2006 | | DONE |
|
|
|
picked up plans
|
Inspection Record Card- Fire | 1/24/2006 | | 1/24/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/9/2006 | | 1/23/2006 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 1/23/2006 | | DONE |
|
|
|
left mess for jon edes that permit is ready
|
Miscellaneous action | | | 1/19/2006 | | DONE |
|
|
|
Received a call from Jon Eades, Treasure Valley Fire protection and requested this project be replace in order of review with Dr. Harmon @ Black Eagle FIR06-00002 (received 1/4/6).
|
Plan resubmittals received | | | 1/9/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/19/2005 | | 1/5/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/5/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 1/5/2006 | | 1/5/2006 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2006 | | DONE |
|
|
|
called ###-#### and told Jon permit ready for pickup
|
Issue and Print Permit | | | 1/5/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/19/2005 | | 1/4/2006 | | PART |
Bill Alexander
|
|
|
|
Application received | | | 12/19/2005 | | |
|
|
|
|
Case Summary | | | 12/19/2005 | | DONE |
|
|
|
|