INSP-Final Inspection | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 2/21/2006 | 2/22/2006 | 2/22/2006 | A | FAIL |
Troy Cobbley
|
|
|
Could not give final due to missing ceiling tile and two heads that are still overspaced. Sprinkler piping is ok to cover.
|
INSP-Final Inspection | 2/20/2006 | 2/21/2006 | 2/21/2006 | P | FAIL |
Troy Cobbley
|
|
|
Inspection stopped after finding multiple heads overspaced and other heads not installed.
|
Plan assigned to (Bill) | 1/30/2006 | | 2/16/2006 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/16/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/16/2006 | | 2/16/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/16/2006 | | |
|
|
|
|
Telephone call | | | 2/16/2006 | | |
|
|
|
Informed Shilo Automatic Sprinkler ###-#### to pick up permit 2-16-06 eus
|
(F) Reprint permit | | | 2/16/2006 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/16/2006 | | DONE |
|
|
|
already issued previously
|
Plan resubmittals received | | | 1/30/2006 | | DONE |
|
|
|
resubmittals received 5 copies of fire sprinler shop drawings and 5 copies of hydraulic calculations and details.
|
Plan assigned to (Bill) | 1/9/2006 | | 1/25/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/9/2006 | | 1/25/2006 | | PART |
Bill Alexander
|
|
|
Re-Submittals Of The Following Items Are Required:
1. Plan is incomplete. The Server #126 room has a raised floor. Fire sprinkler protection will be required under this floor if combustibles are present which includes non rated cabling. Address clarification on the plans to allow for exemption of fire sprinkler protection. (IFC 105.4.2, BMC 7-01-50-IFC 901.2)
2. Plan is incomplete. Accelerator #125 has what appears a ECOH head obstructed between columns D - E and 2 - 3. Provide clarification of construction to determine sprinkler coverage on this plan. (IFC 105.4.2, BMC 7-01-50-IFC 901.2)
3. Plan is incomplete. Within the same vicinity as item 2 above, there are unidentified areas which lacks protection? Provide clarification of occupancy and construction to determine required coverage on this plan. (IFC 105.4.2, BMC 7-01-50-IFC 901.2)
4. Protection missing south of column #3, east of column D. Revise and resubmit. (NFPA 13-8.6.2.2.1, IFC 105.4.2, BMC 7-01-50-IFC 901.2)
5. Protection missing south of column #3, east of column E. Revise and resubmit. (NFPA 13-8.6.2.2.1, IFC 105.4.2, BMC 7-01-50-IFC 901.2)
6. The (unidentified) fire sprinkler riser room lacks protection. Revise and resubmit. (NFPA 13-8.6.2.2.1, IFC 105.4.2, BMC 7-01-50-IFC 901.2)
7. Office #108 does not meet 8.6.2.2. Revise and resubmit. (NFPA 13-8.6.2.2.1, IFC 105.4.2, BMC 7-01-50-IFC 901.2)
8. Janitor #130 spacing exceeds 8.6.2.2. Revise and resubmit. (NFPA 13-8.6.2.2.1, IFC 105.4.2, BMC 7-01-50-IFC 901.2)
9. "Copy Storage #112", "Acctg. Storage #117", "Servers #126", Janitor #130, Accelerator #125 will require more "Occupancy Class" information. (NFPA 13-14.1.3[7], IFC 105.4.2, BMC 7-01-50-IFC 901.2)
10. Provide a required "Fire Sprinkler Upgrade/TI/Remodel Cover Sheet", which is published and can be located at: http://www.cityofboise.org/pds/applications/Fire/TI_Remodel_CoverSheet.pdf.
|
Inspection Record Card- Fire | 1/25/2006 | | 1/25/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/25/2006 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2006 | | DONE |
|
|
|
tlk to lily ###-#### that permit and fees are ready to be picked up
|
Issue and Print Permit | | | 1/25/2006 | | DONE |
|
|
|
|
Miscellaneous action | | | 1/24/2006 | | DONE |
|
|
|
Approved written request for early start on this project to drop 1" pipe with plugs to within 1' of the ceiling from existing shell system prior to issuance of approved plans and permit.
|
Application received | | | 1/9/2006 | | |
|
|
|
|