INSP-Final Inspection | 3/23/2006 | 3/23/2006 | 3/23/2006 | P | PASS |
Forrest France
|
|
|
Required corrections have been made, fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/16/2006 | 3/17/2006 | 3/17/2006 | A | PART |
Forrest France
|
|
|
Verified forward flow, PIV tamper has been disconnected from outside water flow bell as discussed, final pending plan resubmittals as required.
|
Plan assigned to (Bill) | 3/6/2006 | | 3/17/2006 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 3/6/2006 | | 3/17/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/17/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 3/17/2006 | | 3/17/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/17/2006 | | |
|
|
|
Informed Diane (Viking Automatic Sprinkler Co) ###-#### to pick up permit 3-17-06 eus
|
Issue permit | | | 3/17/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/15/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/6/2006 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | FAIL |
Forrest France
|
|
|
Heads are overspaced at location adjacent to office wall and sales floor (exceeding 130ft/2), related demo permit FIR06-00010 must be called in for final, per plan review notes a plan re-submittal is required-see items #1thru 5, perform forward flow test for the backflow preventer (note: system riser modification may be required), system alarm and supervision must be tested and approved prior to final for this sprinkler permit.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2006 | 2/28/2006 | 2/28/2006 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test is satisfactory, rough-in inspection not completed due to failure of the contractor to provide approved plans, review comments, and inspection card on site as required under condition of the permit.
|
Issue and Print Permit | | | 2/13/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/9/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/9/2006 | | DONE |
|
|
|
called ###-#### and left message on voice mail that permit is ready and fees
|
Plan assigned to (Bill) | 1/17/2006 | | 2/8/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/17/2006 | | 2/8/2006 | | PART |
Bill Alexander
|
|
|
Re-Submittals Of The Following Items Are Required:
1. The design head layout and actual head gpm/pressure verified in the calculations, does not meet OH-2 density requirements. Revise calculations matching the layout design and resubmit meeting requirements of NFPA 13-14.4. (Boise Municipal Code 7-01-50 IFC 901.2, IFC 105.4.2)
2. For all systems the design area shall be the hydraulically most demanding based on the criteria of NFPA Chapter 11, Chapter 12, or the special design approaches in accordance with the requirements of NFPA Chapter 13. For gridded systems, the designer shall verify that the hydraulically most demanding area is being used. A minimum of two additional sets of calculations shall be submitted to demonstrate peaking of demand area friction loss when compared to areas immediately adjacent on either side along the same branch lines, unless the requirements of 14.4.4.2.3 are met. Computer programs that show the peaking of the demand area friction loss shall be acceptable based on a single set of calculations. Provide verification through resubmittals the designer has meet these requirements. (NFPA 13-14.4.4.1, 14.4.4.2.1, 14.4.4.2.2, 14.4.4.2.3)
3. "Sprinkler Symbol Description" does not include up-and-downs on armovers depicted on the plan? Provide correct and complete plan clarification and resubmit. Include information on the basement sprinklers as to if these heads are being replaced? (Boise Municipal Code 7-01-50 IFC 901.2, IFC 105.4.2)
4. Provide clarification with detail/s that includes seismic bracing of the new main (in the basement), the penetration through the floor, the type of floor penetrating, clearance, and its support. (Boise Municipal Code 7-01-50 IFC 901.2, IFC 105.4.2)
5. Verification of backflow forward flow test will be required. The systems largest demand must be verified through the same. This notice is to address that the system riser may require modifications to accomplish this code requirement prior to permit acceptance. (NFPA 13-8.16.4.6.1*)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/8/2006 | | 2/8/2006 | | DONE |
|
|
|
|
Case Summary | | | 1/17/2006 | | DONE |
|
|
|
|
Application received | | | 1/17/2006 | | |
|
|
|
|