Permit Information
Permit NumberFIR06-00037
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 1000 S VISTA AVE
Project NameSPR REILLY'S CHURCH SUPPLY
Customer Number 
ePlanReview 
Description
(REILLY'S CHURCH SUPPLY - VISTA VILLAGE) This building is partially fire sprinklered. There is a fire permit for Demolition Permit under FIR06-00010 issued to the same contractor, attached to the same building permit which has not been inspected to date. This permit is for the remodel an existing 6,555-ft/2 tenant space (3,284-ft/2 1st story and 3,271-ft/2 basement) for a new retail sales tenant. The fire sprinkler work is for the installation of sprinkler protection on the first floor, modifications of the existing system related to the New Stairwell located in the southwest basement, constructed to the first floor, the replacement of existing uprights in the basement, the modification of interior nonbearing walls in the basement, the adding of protection for the infill area where the demolition of existing stairs and sprinklers was permitted. Future canopy remodel and fire sprinkler installation will be done under BLD04-02464. This fire sprinkler work is required to comply with the approved drawings, the plan review report, and all applicable codes. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-03176.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/23/20063/23/20063/23/2006PPASS
DetailsForrest France
Required corrections have been made, fire sprinkler permit finaled.
INSP-Final Inspection3/16/20063/17/20063/17/2006APART
DetailsForrest France
Verified forward flow, PIV tamper has been disconnected from outside water flow bell as discussed, final pending plan resubmittals as required.
Plan assigned to (Bill)3/6/2006 3/17/2006 DONE
DetailsBill Alexander
Sprinkler Plan Check3/6/2006 3/17/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  3/17/2006 DONE
Permit Ready to Issue  3/17/2006  
Inspection Record Card- Fire3/17/2006 3/17/2006 DONE
Telephone call  3/17/2006  
Informed Diane (Viking Automatic Sprinkler Co) ###-#### to pick up permit 3-17-06 eus
Issue permit  3/17/2006 DONE
Plan resubmittals received  3/15/2006 DONE
Plan resubmittals received  3/6/2006  
INSP-Sprinkler Rough-in/Hydro2/28/20063/1/20063/1/2006AFAIL
DetailsForrest France
Heads are overspaced at location adjacent to office wall and sales floor (exceeding 130ft/2), related demo permit FIR06-00010 must be called in for final, per plan review notes a plan re-submittal is required-see items #1thru 5, perform forward flow test for the backflow preventer (note: system riser modification may be required), system alarm and supervision must be tested and approved prior to final for this sprinkler permit.
INSP-Sprinkler Rough-in/Hydro2/27/20062/28/20062/28/2006PPART
DetailsForrest France
Overhead hydrostatic test is satisfactory, rough-in inspection not completed due to failure of the contractor to provide approved plans, review comments, and inspection card on site as required under condition of the permit.
Issue and Print Permit  2/13/2006 DONE
Permit Ready to Issue  2/9/2006 DONE
Telephone call  2/9/2006 DONE
called ###-#### and left message on voice mail that permit is ready and fees
Plan assigned to (Bill)1/17/2006 2/8/2006 DONE
Sprinkler Plan Check1/17/2006 2/8/2006 PART
DetailsBill Alexander
Re-Submittals Of The Following Items Are Required:
1. The design head layout and actual head gpm/pressure verified in the calculations, does not meet OH-2 density requirements. Revise calculations matching the layout design and resubmit meeting requirements of NFPA 13-14.4. (Boise Municipal Code 7-01-50 IFC 901.2, IFC 105.4.2)

2. For all systems the design area shall be the hydraulically most demanding based on the criteria of NFPA Chapter 11, Chapter 12, or the special design approaches in accordance with the requirements of NFPA Chapter 13. For gridded systems, the designer shall verify that the hydraulically most demanding area is being used. A minimum of two additional sets of calculations shall be submitted to demonstrate peaking of demand area friction loss when compared to areas immediately adjacent on either side along the same branch lines, unless the requirements of 14.4.4.2.3 are met. Computer programs that show the peaking of the demand area friction loss shall be acceptable based on a single set of calculations. Provide verification through resubmittals the designer has meet these requirements. (NFPA 13-14.4.4.1, 14.4.4.2.1, 14.4.4.2.2, 14.4.4.2.3)

3. "Sprinkler Symbol Description" does not include up-and-downs on armovers depicted on the plan? Provide correct and complete plan clarification and resubmit. Include information on the basement sprinklers as to if these heads are being replaced? (Boise Municipal Code 7-01-50 IFC 901.2, IFC 105.4.2)

4. Provide clarification with detail/s that includes seismic bracing of the new main (in the basement), the penetration through the floor, the type of floor penetrating, clearance, and its support. (Boise Municipal Code 7-01-50 IFC 901.2, IFC 105.4.2)

5. Verification of backflow forward flow test will be required. The systems largest demand must be verified through the same. This notice is to address that the system riser may require modifications to accomplish this code requirement prior to permit acceptance. (NFPA 13-8.16.4.6.1*)
PLANS/APPL TAKEN TO FRONT DESK  2/8/2006 DONE
Inspection Record Card- Fire2/8/2006 2/8/2006 DONE
Case Summary  1/17/2006 DONE
Application received  1/17/2006