INSP-Final Inspection | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for final. Rough-in passed still need riser items addressed.
|
Issue and Print Permit | | | 5/31/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 5/26/2006 | | 5/30/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/26/2006 | | 5/30/2006 | | PASS |
Bill Alexander
|
|
|
Revised calcs for modifications in Area #1 and #2 for spray paint booth.
|
Inspection Record Card- Fire | 5/30/2006 | | 5/30/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/30/2006 | | DONE |
|
|
|
Left voice message for Brodie that permit is ready & fees///5/30/06 @ 10:15am BAS
|
Plan resubmittals received | | | 5/26/2006 | | |
|
|
|
|
INSP-Supply line flush | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Final Inspection | 5/9/2006 | 5/9/2006 | 5/9/2006 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was not for a final but was for an underground hydro test which passed. I had sam measure the amount of leakage which was about 12oz. 15oz was allowed.
|
INSP-Sprinkler Rough-in | 4/19/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover over the hardlid areas.
|
INSP-Sprinkler Rough-in/Hydro | 2/24/2006 | 2/24/2006 | 2/24/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover
|
Sprinkler Plan Check | 2/7/2006 | | 2/23/2006 | | PASS |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 2/23/2006 | | DONE |
|
|
|
Took approved (modified) plans to permit desk for issueing.
|
Permit Ready to Issue | | | 2/23/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 2/23/2006 | | 2/23/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2006 | | |
|
|
|
Informed Crystal (Treasure Valley Fire Protection) ###-#### to pick up permit 2-23-06 eus
|
CHANGE STATUS TO (ISS) | | | 2/23/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/23/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/7/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/6/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/18/2006 | | 2/3/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/18/2006 | | 2/3/2006 | | PART |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/3/2006 | | 2/3/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/3/2006 | | |
|
|
|
|
Telephone call | | | 2/3/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Application received | | | 1/18/2006 | | |
|
|
|
|