INSP-Final Inspection | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 6/21/2006 | 6/22/2006 | 6/22/2006 | P | FAIL |
Troy Cobbley
|
|
|
The supervisory signals that were sent out were received as fire alarm signals.
|
INSP-Final Inspection | 6/21/2006 | 6/21/2006 | 6/21/2006 | P | FAIL |
Troy Cobbley
|
|
|
Provide separate point for the tamper and low air on the dry pipe valve. Need to verify all signals.
|
Issue and Print Permit | | | 5/26/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 5/24/2006 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/24/2006 | | 5/24/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/24/2006 | | DONE |
|
|
|
tlk to rob ahten ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/24/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/24/2006 | | DONE |
|
|
|
|
Plan assigned to (Mary) | 1/24/2006 | | 2/23/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 2/23/2006 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/23/2006 | | |
|
|
|
|
Inspection Record Card- Fire | 2/23/2006 | | 2/23/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2006 | | |
|
|
|
Informed Terry (Protex) ###-#### to pick up permit 2-23-06 eus
|
Alarm Plan Check | | | 2/2/2006 | | FAIL |
|
|
|
Additional information required, Jon Van Stone, E2 Co. to acquire info regarding the new refrigeration unit and forward revised gas detection design to Rob Ahten, protex.
|
Application received | | | 1/24/2006 | | |
|
|
|
|
Case Summary | | | 1/24/2006 | | DONE |
|
|
|
|