Telephone call | | | 3/31/2006 | | DONE |
|
|
|
tlk to trent bice ###-#### that permit and fees are ready to be picked up
|
INSP-Final Inspection | 3/13/2006 | 3/13/2006 | 3/13/2006 | A | PASS |
Forrest France
|
|
|
Escutcheons have been installed, drop ceiling is in place, fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | PART |
Forrest France
|
|
|
Overhead rough-in is acceptable for cover at the drop and hard lid ceiling areas, permit final pending installation of ceiling tile and sprinkler escutcheons.
|
INSP-Sprinkler Rough-in | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | DEFR |
Forrest France
|
|
|
Inspection to be completed 3/6 per agreement.
|
Issue and Print Permit | | | 2/15/2006 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/25/2006 | | 2/14/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/25/2006 | | 2/14/2006 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2006 | | DONE |
|
|
|
|
Case Summary | | | 2/14/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/14/2006 | | 2/14/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/14/2006 | | |
|
|
|
|
Telephone call | | | 2/14/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Application received | | | 1/25/2006 | | |
|
|
|
|