Permit Information
Permit NumberFIR06-00061
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 316 W WASHINGTON ST
Project NameSPR ST LUKES OFFICE MOD
Customer Number3095448
ePlanReview 
Description
ST LUKES OFFICE BUILDING MODIFICATIONS * This building is fully fire sprinklered. To relocate two and add 4 SSP's for the remodel an existing 1200-ft/2 ft office located in the north east corner of this facility. Fire sprinkler work is related to the installation of relocated walls, some half height work station walls, some gridded dropped ceiling work, (possible) lights and HVAC work. The fire sprinkler work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is not (currently) attached to any building permit. Verification will be required if a construction work addressed for required sprinkler modification will require a building permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/7/20064/12/20064/12/2006APASS
DetailsForrest France
Fire sprinkler modifications are satisfactory, inspection passed.
INSP-Final Inspection4/6/20064/7/20064/7/2006AFAIL
DetailsTroy Cobbley
Could not contact dave brown since he takes fridays off and todd woods was not available. I showed up at job site and the found no secretary at the front desk and that the drawings are locked in FACP cabinet. No inspection performed.
Permit Ready to Issue  2/17/2006  
Inspection Record Card- Fire2/17/2006 2/17/2006 DONE
Issue and Print Permit  2/17/2006 DONE
Plan assigned to (Bill)1/25/2006 2/16/2006 DONE
Sprinkler Plan Check1/25/2006 2/16/2006 PASS
DetailsBill Alexander
1/14/2006 - Need verification of a building permit.
PLANS/APPL TAKEN TO FRONT DESK  2/16/2006 DONE
Miscellaneous action  2/14/2006 DONE
Took copy of permit/plan to Dan Stuart to verify construction and a related building permit. 11:30am.
Application received  1/25/2006  
Inspection Record Card- Fire2/17/2006