Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00065
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8201 W OVERLAND RD
Project NameSPR OVERLAND PLAZA SHELL
Customer Number 
ePlanReview 
Description
OVERLAND RETAIL PLAZA - (SHELL) - To install a complete overhead Ordinary Hazard Group 2 fire sprinkler protection system in a new 17,850-ft/2, one story retail shell building constructed on masonry exterior walls, wood roof trusses. This building will be fully fire sprinklered. The sprinklers are used for allowable area increase. This is a shell permit only, and this submittals will not allow occupancy for any tenant modifications. Separate tenant improvement permits will be required to finish this building for occupancy. The underground fire service supply was installed under FIR06-00043. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-02731.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  5/13/2008 DONE
INSP-Final Inspection11/9/200611/9/200611/9/2006PPASS
DetailsForrest France
Fire sprinkler work is complete, permit finaled.
INSP-Final Inspection11/6/200611/7/200611/7/2006PPART
DetailsForrest France
Items from previous inspection verified for completion, forward flow completed, okay for final when ball drip and FDC caps are installed.
INSP-Final Inspection10/25/200610/26/200610/26/2006ACANC
DetailsTroy Cobbley
No time for inspection today.
INSP-Sprinkler Rough-in/Hydro6/6/20066/7/20066/7/2006APART
DetailsTroy Cobbley
Above ground hydro test passed. Sprinkler rough-in failed due to the upright sprinkler heads not meeting NFPA 13 8.6.5.2.1.6 and 8.6.5.2.1.7. Also the sprinkler heads are overspaced at the west end of the sprinkler system.
INSP-Sprinkler Rough-in4/10/20064/11/20064/11/2006APART
DetailsTroy Cobbley
Canopy is ok to cover but one upright sprinkler head is overspaced from the west end of the central big canopy. See marked plans for exact location.
INSP-Sprinkler Rough-in4/7/20064/10/20064/11/2006APART
DetailsTroy Cobbley
Canopy is ok to cover but one upright sprinkler head is overspaced from the west end of the central big canopy. See marked plans for exact location.
INSP-Sprinkler Rough-in4/6/20064/7/20064/7/2006ACANC
DetailsTroy Cobbley
Inspection was supposed to be scheduled for monday.
Sprinkler Plan Check3/14/2006 3/31/2006 PASS
DetailsBill Alexander
Miscellaneous action  3/31/2006 DONE
Took corrected permit submittals to permit desk for calling and distributing.
Miscellaneous action  3/31/2006 DONE
permit picked up, no fee
(F) Reprint permit  3/31/2006  
Plan resubmittals received  3/14/2006 DONE
Plan assigned to (Bill)1/26/2006 2/21/2006 DONE
Sprinkler Plan Check2/17/2006 2/21/2006 PART
DetailsBill Alexander
Re-Submittals Of The Following Items Are Required:
1. Fire department connections shall be on the street side of buildings, immediately discernible, fully visible and recognizable from the street or nearest point of fire department apparatus access. Relocate FDC to a location that faces either S. Milwaukee or Overland. Pipe sizing shall be equivalent to requirements of NFPA 13. (IFC 912.2.1, BMC 7-01-50-IFC 901.2)

2. Designer give construction information on the roof membrane yet does not address the fire sprinkler riser room meeting requirements specifically addressed in, Boise Municipal Code 7-01-53 CONTROL VALVE LOCATION - IFC Section 903.1.3? Provide required riser room construction, door information and signage and resubmit. (BMC 7-01-50-IFC 901.2).

3. Designer shows a section detail addressing TJL's, with hanger detail addressing TJI's? Provide clarification of construction in this facility and address correct (manufacturers) attaching requirements for the required listed hanger attaching devises. Each shall coordinate with the other and meet both the manufacturer and NFPA 13 Chapter 9. That information shall be included on the plans. (BMC 7-01-50-IFC 901.2).

4. Provide an auxiliary drain as needed to the 2" far main per requirements of NFPA 13-5 14.2.5 and show it on the plan. (BMC 7-01-50-IFC 901.2).
PLANS/APPL TAKEN TO FRONT DESK  2/21/2006 DONE
Inspection Record Card- Fire2/21/2006 2/21/2006 DONE
Permit Ready to Issue  2/21/2006  
Telephone call  2/21/2006  
Informed Trent (Shilo Automatic Sprinkler) ###-#### to pick up permit 2-21-06 eus
Issue and Print Permit  2/21/2006 DONE
Plan resubmittals received  2/17/2006 DONE
Shilo used the wrong Building Permit.
Sprinkler Plan Check1/28/2006 2/16/2006 FAIL
DetailsBill Alexander
This permit is attached to a demolition burn permit. No other BLD associated at the address. Returned plans to permit desk. Contacted Trent Bice indicating correction required.
Miscellaneous action  2/16/2006 DONE
Emailed Trent Bice indicating this fire permit is associated with a BLD Demo Permit for a residential burn. No other BLD associated with this address. Returned documents to permit desk for returning.
Telephone call  2/16/2006 DONE
left mess that permit has incorrect bld # & need to pickup
Telephone call  2/16/2006 DONE
gave plans to customer had wrong bld #
Application received  1/26/2006