INSP-Final Inspection | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
Forrest France
|
|
|
Inspection completed in the AM as previously agreed, fire alarm functioned properly, inspection passed.
|
INSP-Final Inspection | 4/5/2006 | 4/6/2006 | 4/6/2006 | A | CANC |
Troy Cobbley
|
|
|
No time to complete this inspection today, to be rescheduled per agreement with contractor.
|
INSP-Final Inspection | 4/3/2006 | 4/3/2006 | 4/3/2006 | P | NR |
Troy Cobbley
|
|
|
low air pressure switch has not been setup. no items tested except hood which tested ok
|
Plan assigned to (Mary) | 2/2/2006 | | 2/28/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 2/28/2006 | | PASS |
|
|
|
Approved pending PDS Fire Inspector field verification. No comments written.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/28/2006 | | DONE |
|
|
|
Lynde Jones red-lined the submittals to include the appropriate zones.
|
Inspection Record Card- Fire | 2/28/2006 | | 2/28/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/28/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 2/22/2006 | | FAIL |
|
|
|
Request zone numbers defined on the inputs. Will allow red-lines to be done when the plans are approved and picked up. Called Lynde Jones (Mt Alarm), she stated she would call with the zones.
|
Application received | | | 2/2/2006 | | |
|
|
|
|
Case Summary | | | 2/2/2006 | | DONE |
|
|
|
|