Permit Information
Permit NumberFIR06-00101
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2970 W ELDER ST
Project NameSPR CAMBRIA SUITES
Customer Number 
ePlanReview 
Description
(CAMBRIA SUITES) - This building is required to have a NFPA 13 Fire Sprinkler system used for area increase. To install a complete, wet, 13 system and a Class 1 Wet Manual Standpipe system with residential occupancies, in a new 78,220-ft/2, four story, wood framed, 119 unit motel with approximately 14,730-ft/2 areas for meeting rooms, indoor swimming pool, indoor spa, lobby and commercial food kitchen. Also a 650-ft/2 covered porte cochere entry. Underground fire sprinkler service supply was permitted under FIR05-00883. This permit is attached to BLD05-02392.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/2/20074/2/20074/3/2007PPASS
DetailsForrest France
Required corrections have been verified for compliance, final fire sprinkler inspection passed, permit finaled.
INSP-Sprinkler Rough-in/Hydro4/2/20074/2/20074/2/2007PCANC
DetailsForrest France
johnathan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Override - Parcel Holds  4/2/2007  
not temp occ inspect
INSP-Final Inspection3/29/20073/30/20073/30/2007PFAIL
DetailsForrest France
The remainder of building final sprinkler inspection walkthrough completed today, noted heads are overspaced in the linen storage rooms on 2nd and 3rd floors, heads in the electrical room on the 4th floor are overspaced, missing heads at two mechanical closets on the 4th and 3rd floors, need to remove tape covering one head in the pool room, missing ceiling tile at the 1st floor storage rooms.
INSP-Final Inspection3/27/20073/28/20073/28/2007AFAIL
DetailsForrest France
Missing heads in the building storage room, blocked pendent at the first floor east stair landing, missing escutcheons at several locations, painted head in the pool room, missing flex coulpings at the riser, wet head in the cooler at 33 deg. maintained, one head is overspaced at the ADA room, inspection concluded at the first floor due to the number of defficient items found.
INSP-Final Inspection3/21/20073/23/20073/23/2007AFAIL
DetailsForrest France
Project is not ready for final as several defficiencies were noted on the first floor including overspaced heads, blocked and obstructed heads, missing escutcheons, painted heads, wet head in a cooler maintainig a temp of 35 deg, missing heads, missing ceilings, missing "911 sign", etc. Need sprinkler alarm supervision test and forward flow prior to final. Remainder of the full building sprinkler final walkthrough and test postponed until necessary corrections are made and contractor is ready for final.
INSP-Sprinkler Rough-in/Hydro3/20/20073/21/20073/21/2007PPART
DetailsForrest France
Retest of the 1st floor hydrostatic OH passed inspection.
INSP-Sprinkler Rough-in/Hydro3/16/20073/16/20073/16/2007PFAIL
DetailsForrest France
OH hydrostatic test failed for the 3" manifold system due to pressure loss at the guage, the 4" manifold system hydro passed.
Override - Parcel Holds  3/16/2007  
Override - Parcel Holds  3/16/2007  
INSP-Sprinkler Rough-in/Hydro3/8/20073/9/20073/9/2007AFAIL
DetailsForrest France
Correction notice items from the previous inspection for the antifreeze system completed on 2/27/07 are not complete, also noted to contractor some items still in need of completion including OH floors 1-4 and UG supply hydro tests, missing heads in the gravity chute, and remaining OH inspections.
INSP-Sprinkler Rough-in/Hydro2/27/20072/27/20072/27/2007PFAIL
DetailsForrest France
Inspection for the antifreeze system hydrostatic test failed due to visual leakage at two locations, also the SW heads as installed under the exposed composite wood joist obstructed construction ceiling do not meet requirements of NFPA 13 8.4.2 (1).
Override - Parcel Holds  2/27/2007  
INSP-Sprinkler Rough-in/Hydro2/23/20072/26/20072/26/2007PCANC
DetailsForrest France
Cancel inspection per phone call from contractor.
Override - Parcel Holds  10/12/2006  
Inspection Record Card- Fire10/12/2006 10/12/2006 DONE
Override - Parcel Holds  10/12/2006  
Permit Ready to Issue  10/12/2006  
Telephone call  10/12/2006 DONE
tlk to lily ###-#### that permit and fees are ready to be picked up
Override - Parcel Holds  10/12/2006  
Issue and Print Permit  10/12/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/10/2006 DONE
Sprinkler Plan Check  10/6/2006 PASS
Resubmitted plans approved by B. Johnson.
Plan resubmittals received  9/21/2006  
INSP-Sprinkler Rough-in8/18/20068/21/20068/21/2006PPART
DetailsForrest France
c/n items related to the 1st floor rough-in have been completed, 2nd floor guest rooms are okay to cover.
Override - Parcel Holds  8/18/2006  
Override - Parcel Holds  8/18/2006  
INSP-Sprinkler Rough-in8/15/20068/16/20068/16/2006PFAIL
DetailsForrest France
Inspection for 1st floor rough-in failed due to overspaced hanger at east entry, blocked upright heads above the pool area in the concealed combustible space, missing hangers at some locations, head in the linen room is overspaced, branch line at the electrical room extends through both sides, one area at the SE as indicated on plans is not completed for inspection at this time.
Override - Parcel Holds  8/15/2006  
Override - Parcel Holds  8/15/2006  
Override - Parcel Holds  8/15/2006  
Override - Parcel Holds  8/15/2006  
INSP-Sprinkler Rough-in7/10/20067/11/20067/11/2006APART
DetailsForrest France
OH rough-in inspection at floors 3 and 4 only are okay for cover as discussed, one head is overspaced at guest room east side 4th floor, end of line heads at some locations exceed upward lift allowed and will require restraint, noted hanger overspacing at certain locations on 1" branch lines, heads at some locations will require adjustment to meet ceiling height, noted thermal expansion at grid system on the 3rd floor.
INSP-Sprinkler Rough-in7/7/20067/10/20067/10/2006ANR
DetailsForrest France
Per contractor the inspection request was intended for Tues. 7/11, no approved plans on site for review, to be rescheduled.
Override - Parcel Holds  7/10/2006  
Override - Parcel Holds1/1/19001/1/19007/7/2006  
(F) Reprint permit  5/1/2006 DONE
CHANGE STATUS TO (ISS)  5/1/2006 DONE
Sprinkler Plan Check4/7/2006 4/28/2006 PASS
DetailsBill Alexander
Plan assigned to (Bill)4/7/2006 4/28/2006 DONE
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/28/2006 DONE
Override - Parcel Holds  4/28/2006  
Permit Ready to Issue  4/28/2006 DONE
Telephone call  4/28/2006 DONE
tlk to trent bice ###-#### that permit and fees are ready to picked up
Plan resubmittals received  4/7/2006  
Override - Parcel Holds  4/5/2006  
Permit Ready to Issue  4/5/2006 DONE
Telephone call  4/5/2006 DONE
lft ms with secretary that permit and fees are ready to be picked up
Override - Parcel Holds  4/5/2006  
Issue and Print Permit  4/5/2006 DONE
Plan assigned to (Bill)2/10/2006 4/4/2006 DONE
Sprinkler Plan Check3/16/2006 4/4/2006 PART
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/4/2006 DONE
Override - Parcel Holds  4/4/2006  
Inspection Record Card- Fire4/4/2006 4/4/2006 DONE
Parcel tag for mechanical permit not directly related to FIR permit 4-4-06 eus
Plan resubmittals received  3/16/2006 DONE
Received 5 copies of fire sprinkler shop drawings and 5 copies hydraulic calculations and details.rad
Sprinkler Plan Check2/10/2006 3/3/2006 FAIL
The data has been moved to a Word document attached to this case.
Miscellaneous action  3/3/2006 DONE
Returned plans/documents to permit desk for returning and corrections.
Telephone call  3/3/2006  
Informed Trent (Shilo Automatic Sprinkler Co) ###-#### to pick up failed plans per Bill 3-3-06 eus
Application received  2/10/2006