Permit Information
Permit NumberFIR06-00120
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 1549 N CORMORANT PL
Project NameSPR UG HOLBROOK BLD SHELL
Customer Number 
ePlanReview 
Description
HOLBROOK BUILDING UG (SHELL) - To install approximately 786'-0" of 6" C-900 PVC connected at the property line off Cormorant Place, offset, around to the south (?) and into a system riser room with proposed 1 hour occupancy separation and outside access control, for a new 15,500-ft/2, one story, steel and wood framed retail and office shell building. This building will be fully fire sprinklered. The sprinklers are used for area increase. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD05-02746.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/27/20066/27/20066/27/2006PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro6/22/20066/22/20066/22/2006PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro6/16/20066/19/20066/19/2006ACANC
DetailsTroy Cobbley
Contact: Todd - Cover Inspection - Early AM; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Supply line flush6/9/20066/13/20066/13/2006APASS
DetailsTroy Cobbley
Underground flush passed.
INSP-Sprinkler Rough-in/Hydro6/9/20066/12/20066/12/2006APASS
DetailsTroy Cobbley
Underground hydro test passed.
INSP-Sprinkler Rough-in/Hydro3/9/20063/10/20063/10/2006APASS
DetailsTroy Cobbley
Underground piping is ok to cover
Inspection Record Card- Fire2/21/2006 2/21/2006 DONE
Permit Ready to Issue  2/21/2006 DONE
Telephone call  2/21/2006 DONE
left mess that permit is ready
Issue and Print Permit  2/21/2006 DONE
Plan assigned to (Bill)2/16/2006 2/17/2006 DONE
Sprinkler Plan Check2/16/2006 2/17/2006 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  2/17/2006 DONE
Application received  2/16/2006