INSP-Final Inspection | 3/19/2007 | 3/20/2007 | 3/20/2007 | A | PASS |
Forrest France
|
|
|
Fire alarm work passed inspection, permit finaled.
|
INSP-Final Inspection | 2/27/2007 | 2/28/2007 | 2/28/2007 | A | DEFR |
Forrest France
|
|
|
Inspection to be rescheduled.
|
INSP-Final Inspection | 10/30/2006 | 11/1/2006 | 11/1/2006 | A | PART |
Forrest France
|
|
|
Per inspection by M. Timmerman the AV portion of work for this permit in the fab level is satisfactory.
|
Plan assigned to (Mary) | 2/24/2006 | | 6/30/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 6/30/2006 | | PASS |
|
|
|
Approved pending PDS Fire Inspector field verification. No comments written.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2006 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/30/2006 | | DONE |
|
|
|
|
Alarm Plan Check | | | 6/26/2006 | | FAIL |
|
|
|
Resubmittal required. New corridors created do not have sufficient visuals.
|
Miscellaneous action | | | 5/26/2006 | | DONE |
|
|
|
Plans not ready...no changes
|
Miscellaneous action | | | 4/28/2006 | | DONE |
|
|
|
Plans NOT ready yet.
|
Alarm Plan Check | | | 4/4/2006 | | FAIL |
|
|
|
Provide the following information:
1) ceiling heights (FA2.1.1)
2) existing pull stations shown on demo, but not included on new
3) existing smoke for BPS3.3 shown on dem, but not included on new
4) FA2.2.1, H/S demoed, new wall appears that the mid section of room 101E has no coverage.
|
Application received | | | 2/24/2006 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Inspection | 11/1/2006 | 11/1/2006 | | | |
|
|
|
Conducted A/V Inspection Only Fab Level. Inspection by Mike Timmerman 11/1/2006. Remaining will need to be completed on next inspection.
|