Permit NumberFIR06-00138
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2033 E SUMMERSWEET
Project NameCOLUMBIA BUSINESS PARK BLDG A
Customer Number 
ePlanReview 
Description
(IDAHO STATE UNIVERSITY DENTAL) The sprinkler scope of work is to add new pendant heads to an existing sprinkler system to accommodate new wall and ceiling layout.
The building scope of work is for a new 2,923 sq. ft. expansion to an existing 2,077 sq. ft. space for a new dental office tenant within an existing 16,275 sq. ft. building per approved plans. New total area for the dental office tenant space will be 5,000 sq. ft. The expansion will be a phased project per the plan. Work to include providing two new storefront windows in former exterior door openings, new interior walls and doors, interior finish, new suspended ceiling work, adding a third accessible restroom to the space, fire sprinkler work, mechanical work, plumbing work, and electrical work. A new Certificate of Occupancy is to be issued when completed and approved. Nonseparated Uses per IBC Section 302.3.1. NOTE: This building is fully fire sprinklered for area increase.
The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD5-03341.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/4/20068/4/20068/4/2006PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection3/29/20063/31/20063/30/2006AFAIL
DetailsTroy Cobbley
Duplicate inspection from yesterday. Need to re-install the sprig up along the west exterior wall that was removed and install ceiling tile.
INSP-Final Inspection3/30/20063/30/20063/30/2006PFAIL
DetailsTroy Cobbley
Need to re-install the sprig up along the west exterior wall that was removed and install ceiling tile.
INSP-Final Inspection3/21/20063/22/20063/22/2006PNR
DetailsForrest France
Per conversation with contractor, the project is not ready for inspection at this time.
Plan assigned to (Bill)2/24/2006 3/21/2006 DONE
Sprinkler Plan Check2/27/2006 3/21/2006 PASS
DetailsTroy Cobbley
Approved with comments
PLANS/APPL TAKEN TO FRONT DESK  3/21/2006 DONE
Inspection Record Card- Fire3/21/2006 3/21/2006 DONE
Permit Ready to Issue  3/21/2006 DONE
Telephone call  3/21/2006 DONE
lft ms with secretary for trent bice ###-#### that permit and fees are ready to be picked up
Issue and Print Permit  3/21/2006 DONE
Miscellaneous action  3/2/2006 DONE
Early Start requeste signed by Sam 8:49
Application received  2/24/2006